CERAMIC FUSE TUBE/BARRELS USED IN HRC FUSE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

CERAMIC FUSE TUBE/BARRELS USED IN HRC FUSE
[CODE NO. 1590]

In electronics and electrical engineering, a fuse (from the French fuser, Italian fuso, “spindle”[1]) is a type of low resistance resistor that acts as a sacrificial device to provide over current protection, of either the load or source circuit. Its essential component is a metal wire or strip that melts when too much current flows through it, interrupting the circuit that it connects. Short circuits, overloading, mismatched loads, or device failure are the prime reasons for excessive current. Fuses are an alternative to circuit breakers.

PROJECT REPORT COVERS:

  •         Introduction
  •         Uses and Applications
  •         Properties
  •         Market Survey with future aspects
  •         Present Manufacturers
  •         B.I.S. Specifications
  •         Manufacturing Process with Formulae
  •        Cost Economics with Profitability Analysis
  •         Capacity
  •         Land & Building Requirements with Rates
  •         List & Details of Plant and Machinery with their Costs
  •         Raw Materials
  •         Details/List and Costs
  •         Power & Water Requirements
  •         Labour/Staff Requirements
  •         Utilities and Overheads
  •         Total Capital Investment
  •         Turnover
  •         Cost of Production
  •         Break Even Point
  •         Profitability
  •         Land Man Ratio
  •         Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

10.00 MT/Day

Land and Building

Area 2.00 Acres Rs. 5.20 Cr

Plant & Machinery

Rs. 6.00 Cr

Working Capital 3 Months

Rs. 4.88 Cr

Total Capital Investment

Rs. 16.56 Cr

Rate of Return

39%

Break Even Point

45%