FRP MANHOLE COVERS MADE IN HYDRAULIC PRESS THROUGH SMC

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

A manhole cover is a removable plate forming the lid over the opening of a manhole, to prevent anyone or anything from falling in, and to keep out unauthorized persons and material.

FRP Manhole cover is lightweight and excellent protection against corrosion and the effects of chemicals because it is made from FRP (fiber reinforced plastic). It weighs only one seventh of the weight of an average cast iron cover. Because this cover is lightweight, it is easy to remove it during maintenance.

INTRODUCTION
FEATURE OF FRP MAN HOLE COVER
PROPERTIES OF FRP
APPLICATION AND USES
B.I.S. SPECIFICATION
MARKET SURVEY
EXPORTS OF FRP MANHOLE COVER
LIST OF GLOBAL IMPORTERS FOR FRP MANHOLE COVERS
MANUFACTURERS/SUPPLIERS OF FRP MAN HOLE COVER
MANUFACTURING PROCESS
COMPRESSION MOLDING PROCESS
TYPES OF COMPRESSION MOULDING
TESTING OF FRP MAN HOLE COVER
PROCESS FLOW DIAGRAM
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
PROJECT IMPLEMENTATION SCHEDULES
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF RAW MATERIALS

APPENDIX – A :

1.      COST OF PLANT ECONOMICS
2.      LAND & BUILDING
3.      PLANT AND MACHINERY
4.      FIXED CAPITAL INVESTMENT
5.      RAW MATERIAL
6.      SALARY AND WAGES
7.      UTILITIES AND OVERHEADS
8.      TOTAL WORKING CAPITAL
9.      COST OF PRODUCTION
10.      PROFITABILITY ANALYSIS
11.      BREAK EVEN POINT
12.      RESOURCES OF FINANCE
13.      INTEREST CHART
14.      DEPRECIATION CHART
15.      CASH FLOW STATEMENT

Category: Tag:

Additional information

Plant Capacity

2.40 MT./day

Land & Building

(3000 Sq.Mtr) Rs. 7.60 Cr

Plant and Machineries

Rs. 1.24 Cr

Working Capital for 2 Months

Rs. 1.09 Cr

Total Capital Investment

Rs. 10.16 Cr

Rate of Return

25%

Break Even Point

55%