LOW CARBON FERRO MANGANESE ON ALUMINO THERMIC PROCESS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Metallurgical knowledge had its beginnings in the stone  age
when  same ancient craftsman first recognized the  difference  in
behaviour  amongst  certain  of the “rocks”  with  which  he  was
working. The stones familiar to this primitive aetisan were  hard
and  brittle, and were capable of being fashioned into tools  and
weapons  only  by  fedious  shaping,  chip  by  chip.  His  first
encoumter  with  metal then, undoubtedly native copper  or  gold,
must have been an exciting experiences.

Project Report Covers:

Introduction
Uses and Applications
Properties
Market Survey with future aspects
Present Manufacturers
B.I.S. Specifications
Manufacturing Process with Formulae
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials
Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials.

Category: Tag:

Additional information

Plant Capacity

35.00 MT/Day

Land & building

4000 Sq.mtrs Rs. 1.51Cr.

Plant & machinery

Rs. 48.25 Lacs

W.c for 2 months

Rs. 5.94 Cr

Total capital investment

Rs. 8.17 Cr

Rate of return

30%

Break even point

59%