The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Plaster is one of the oldest known synthetic building materials: it was used by the Egyptians at least 4000 years ago in the construction of the pyramids, and the Greeks were producing decorative plaster work by 500 BC. The chemistry of the conversion of gypsum to plaster was also investigated early on by chemists such as Le Chatelier (1850 – 1936) and van’t Hoff (1852 – 1911).

Plaster is made by heating gypsum (CaSO4.2H2O) powder, thus converting it to calcium sulphate hemihydrate (CaSO4.½H2O). The hemihydrate is also known as stucco or Plaster of Paris . probably so named because of the very large deposit of pure gypsum found beneath Paris. When water is added to the stucco, the material rehydrates to give a solid mass of gypsum. This rehydration is accompanied by an increase in temperature and a slight expansion of the plaster, causing the gypsum to perfectly fill a mould.

Project Reports Cover:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

100.00 MT/Day

Land & Building

Area 5000 Sq.Mtrs. Rs. 6.28 Cr

Plant and Machinery

Rs.1.59 Cr

Working Capital for 1 Month

Rs. 7.96 Cr

Total Capital Investment

Rs. 16.14 Cr

Rate of Return

40%

Break Even Point

35%