<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Project report on ERW Pipe - Technology Book - Feasibility Report - Market Survey - Industrial Report</title>
	<atom:link href="https://projectreports.eiriindia.org/product-tag/erw-pipe/feed/" rel="self" type="application/rss+xml" />
	<link>https://projectreports.eiriindia.org/product-tag/erw-pipe/</link>
	<description>We Create Industrialist</description>
	<lastBuildDate>Wed, 22 Feb 2023 05:52:16 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.3</generator>

<image>
	<url>https://projectreports.eiriindia.org/wp-content/uploads/2018/12/cropped-logo-1-32x32.jpg</url>
	<title>Project report on ERW Pipe - Technology Book - Feasibility Report - Market Survey - Industrial Report</title>
	<link>https://projectreports.eiriindia.org/product-tag/erw-pipe/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>ERW MS GALVANISED CIRCULAR PIPE  (SIZE: 13MM TO 75MM)</title>
		<link>https://projectreports.eiriindia.org/product/erw-ms-galvanised-circular-pipe-size-13mm-to-75mm/</link>
		
		<dc:creator><![CDATA[EIRI Team]]></dc:creator>
		<pubDate>Wed, 22 Feb 2023 05:52:16 +0000</pubDate>
				<guid isPermaLink="false">https://projectreports.eiriindia.org/?post_type=product&#038;p=15571</guid>

					<description><![CDATA[<p>Electric resistance welded (ERW) pipe is manufactured by cold-forming a sheet of steel into a cylindrical shape. Current is then passed between the two edges of the steel to heat the steel to a point at which the edges are forced together to form a bond without the use of welding filler material.</p>
<p>ERW steel pipes &#38; tubes find widespread usage across industries and fields. In addition to various engineering industries, they are used for water, oil and gas distribution, line pipes, fencing, scaffolding, etc. They are also used for agricultural purposes, drinking water supply and thermal power, for hand pumps for deep boring wells and also as protection for cables (telecom), among others.</p>
<p>Depending on the requirement of the end user industry, ERW steel pipes &#38; tubes are available in various wall thicknesses, diameters, and qualities. The different types include line precision pipes, tubular poles, electric poles, lightweight galvanized pipes for sprinkler irrigation, among others. The industry has sufficient capacity to manufacture the different types of pipes &#38; tubes. High performance ERW steel pipes &#38; tubes possess high strength, toughness and are corrosion resistant. In the manufacturing process of ERW steel pipes &#38; tubes, the edges to be welded are mechanically pressed together and electric resistance or electric induction is used to generate the heat required for welding.</p>
<p>With the adoption of better welding technology, ERW pipes &#38; tubes are now widely used in the oil &#38; gas sector. A number of ERW steel pipes &#38; tubes production units are in the SSI sector. Higher demand from the oil &#38; gas industry, infrastructure and automobile industries has led to a healthy increase in production of ERW steel pipes.</p>
<p>It is intended to prepare a Feasibility Report to install 18000Tons/Year ERW MS galvanized circular pipe (size: 13mm to 75mm) production facility as a Green Field Project.</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-ms-galvanised-circular-pipe-size-13mm-to-75mm/">ERW MS GALVANISED CIRCULAR PIPE  (SIZE: 13MM TO 75MM)</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>• INTRODUCTION<br />
• TYPES OF ERW PIPE<br />
• PHYSICAL PROPERTIES OF PIPING MATERIALS<br />
• PROPERTIES<br />
• ADVANTAGES OF ERW PIPE<br />
• USES/APPLICATIONS<br />
• MARKET OVERVIEW<br />
• BIS SPECIFICATIONS<br />
• SUPPLIERS OF RAW MATERIALS<br />
• MANUFACTURING PROCESS STEPS/PROCESS FLOW<br />
• PLANT &amp; MACHINERY (BROADLY)<br />
• SUPPLIERS OF PLANT AND MACHINERY/TURNKEY<br />
• ENGINEERING DESIGN CONSIDERATIONS<br />
• ETP FACILITY<br />
• SEWAGE AND WASTE WATER EFFLUENT<br />
• WASTE GENERATION &amp; MANAGEMENT/GREEN BELT<br />
• UTILITIES PER MONTH (ESTIMATED)<br />
• PRINCIPLES OF PLANT LAYOUT<br />
• PLANT LOCATION FACTORS<br />
• HEALTH SAFETY AND ENVIRONMENT<br />
• ANTICIPATED ENVIRONMENTAL IMPACTS<br />
• MITIGATION MEASURES (PROPOSED)<br />
• HSE REQUIREMENT<br />
• PROPOSED IMPLEMENTATION SCHEDULE<br />
• PROJECT FINANCIALS<br />
• PRELIMINARY LAYOUT<br />
• CONCLUSIONS</p>
<p>APPENDIX – A:</p>
<p>01. PLANT ECONOMICS<br />
02. LAND &amp; BUILDING<br />
03. PLANT AND MACHINERY<br />
04. OTHER FIXED ASSESTS<br />
05. FIXED CAPITAL<br />
06. RAW MATERIAL<br />
07. SALARY AND WAGES<br />
08. UTILITIES AND OVERHEADS<br />
09. TOTAL WORKING CAPITAL<br />
10. TOTAL CAPITAL INVESTMENT<br />
11. COST OF PRODUCTION<br />
12. TURN OVER/ANNUM<br />
13. BREAK EVEN POINT<br />
14. RESOURCES FOR FINANCE<br />
15. INSTALMENT PAYABLE IN 5 YEARS<br />
16. DEPRECIATION CHART FOR 5 YEARS<br />
17. PROFIT ANALYSIS FOR 5 YEARS<br />
18. PROJECTED BALANCE SHEET FOR (5 YEARS)</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-ms-galvanised-circular-pipe-size-13mm-to-75mm/">ERW MS GALVANISED CIRCULAR PIPE  (SIZE: 13MM TO 75MM)</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ERW AND SPIRAL WELDED PIPE</title>
		<link>https://projectreports.eiriindia.org/product/erw-and-spiral-welded-pipe/</link>
		
		<dc:creator><![CDATA[EIRI Team]]></dc:creator>
		<pubDate>Wed, 01 Sep 2021 09:02:19 +0000</pubDate>
				<guid isPermaLink="false">https://projectreports.eiriindia.org/?post_type=product&#038;p=15027</guid>

					<description><![CDATA[<p>(A) SPIRAL WELDED PIPE</p>
<p>Spiral submerged arc welded pipe, a type of spirally welded steel pipe produced by using the double-sided submerged arc welding method.</p>
<p>Spiral welded pipes are formed using narrower plates or hot rolled coils, which lowers their production costs significantly. The spiral welding process permits the production of large-diameter pipes suitable for transporting large volumes of oil and gas. Traditional SSAW pipes were historically limited to low pressure applications; however, modern SSAW pipes have been used extensively in Russia, Canada and Asian countries in high pressure gas pipelines.</p>
<p>Spiral Weld Pipe, as the name implies, is a steel pipe which has a seam running its entire length in a spiral form. In the past, due to the method of manufacture, Spiral Welded pipe was relegated to low pressure and structural applications. With the development of the Submerged Arc Welding process, the production of large hot rolled coils of sufficient width and the development of dependable non-destructive testing methods, it is now possible to produce Spiral Weld pipe for high pressure service</p>
<p>Spiral welded pipe is an alternative process, spiral weld construction allows large diameter pipe to be produced from narrower plates or skelp. The defects that occur in spiral welded pipe are mainly those associated with the SAW weld, and are similar in nature to those for longitudinally welded SAW pipe.</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-and-spiral-welded-pipe/">ERW AND SPIRAL WELDED PIPE</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>INTRODUCTION<br />
(A) SPIRAL WELDED PIPE<br />
PROPERTIES<br />
USES AND APPLICATION<br />
OIL AND GAS PIPELINE<br />
POWER PLANT<br />
WATER &amp; SEWERAGE<br />
STRUCTURAL<br />
OTHER INDUSTRIAL<br />
(B) ERW PIPE<br />
TYPES OF ERW PIPE<br />
(1) LOW-FREQUENCY-WELDED ERW (LF-ERW) PIPE<br />
(2) HIGH-FREQUENCY-WELDED ERW (HF-ERW) PIPE<br />
(3) DIRECT-CURRENT-WELDED ERW (DC-ERW) PIPE<br />
PHYSICAL PROPERTIES OF PIPING MATERIALS<br />
MALLEABILITY<br />
DUCTILITY<br />
BRITTLENESS<br />
ELASTICITY<br />
CONDUCTIVITY<br />
CHEMICAL RESISTANCE/ RESISTANCE TO CORROSION<br />
PROPERTIES<br />
ADVANTAGES OF ERW PIPE<br />
USES AND APPLICATION<br />
USES<br />
APPLICATION<br />
B.I.S. SPECIFICATION<br />
MANUFACTURING PROCESS<br />
(A) FOR SPIRAL WELDED PIPE<br />
PROCESS FLOW CHART FOR SPIRAL WELDED PIPE<br />
MANUFACTURING PROCESS OF SPIRAL WELDED PIPE<br />
STEPS ARE GIVEN BELOW<br />
(1) PRODUCTION METHODOLOGY<br />
(2) GEOMETRIC MONITORING<br />
(3) END SHEARING, BUTT WELDING AND SIDE GUIDE ROLLERS<br />
(4) THE MAKING OF SPIRAL WELD PIPES<br />
(5) WELDING OF PIPE<br />
(6) CUTTING OF PIPE<br />
(7) TESTING OF PIPE<br />
(8) FINAL INSPECTION, VISUAL CHECKING, WEIGHING AND MEASURING<br />
(9) COATING OF PIPE<br />
(10) FINAL MARKING<br />
(B) FOR ERW PIPE<br />
PROCESS FLOW CHART<br />
MANUFACTURING PROCESS<br />
1. UNCOILED, LAVELED AND WELDING OF STRIP<br />
2. STRIPPING<br />
3. LOOPING<br />
4. EDGE TRIMMING<br />
5. FORMING<br />
6. WELDING<br />
7. BEAD TRIMMING<br />
8. SIZING<br />
9. CUTTING<br />
10. NORMALISING<br />
11. END FACING AND BEVELLING<br />
12. TESTING<br />
ULTRASONIC TESTING<br />
EDDY-CURRENT TESTING<br />
HYDROSTATIC TESTING<br />
MAGNETIC PARTICLE TESTING<br />
RADIOGRAPHIC (X-RAY) TESTING<br />
DYE-PENETRANT TEST<br />
14. MARKING<br />
PLANT AND MACHINERY<br />
(1) UNCOILER<br />
(2) LAVELER<br />
(3) SHEAR AND WELDER<br />
HIGH QUALITY WELDING SEAM.<br />
1. SWITCHGEAR RECTIFYING CABINET<br />
2. INVERTER OUTPUT CABINET<br />
3. CONNECTING OPTICAL FIBER<br />
4. CIRCULATION SOFT WATER COOLING SYSTEM<br />
5. CENTRAL OPERATION CONSOLE<br />
6. MECHANICAL ADJUSTMENT DEVICE<br />
(4) ACCUMULATOR<br />
ACCUMULATOR<br />
THE HORIZONTAL SPIRAL ACCUMULATOR FOR WELDED PIPE LINE<br />
(5) FORMING AND SIZING SECTION<br />
FORMING AND SIZING MILL<br />
MATURE TECHNOLOGY FOR ROLLER COMPATIBILITY<br />
OPTIMIZED FORMING<br />
EDGE BENDING<br />
W-FORMING ON FIRST STAND<br />
UNIQUE MODULE ROLL (ASSEMBLY ROLL) AND JUANTIE (EDGE<br />
GRADUALLY TO CENTER) FORMING TECHNOLOGY<br />
(6) HF SOLID STATE WELDER<br />
HIGH QUALITY WELDING SEAM.<br />
1. SWITCHGEAR RECTIFYING CABINET<br />
2. INVERTER OUTPUT CABINET<br />
3. CONNECTING OPTICAL FIBER<br />
4. CIRCULATION SOFT WATER COOLING SYSTEM<br />
5. CENTRAL OPERATION CONSOLE<br />
6. MECHANICAL ADJUSTMENT DEVICE<br />
(7) ANNEALING FURNACE<br />
(8) FLYING SAW<br />
FLYING SAW<br />
MAIN SPECIFICATION:<br />
MAIN SPECIFICATION:<br />
FLYING SAW ALL DIGITAL CONTROL SYSTEM<br />
(9) FACING AND BEVELING MACHINE<br />
(10) STRAIGHTNER MACHINE<br />
(11) THREADING MACHINE<br />
THREADING MACHINE FEATURES:<br />
(12) HYDRAULIC TESTING MACHINE<br />
INDIAN SAW PIPE INDUSTRY<br />
TABLE 1 – PRODUCT SUMMARY<br />
INTERNATIONAL DEMAND DRIVERS<br />
OIL<br />
CHART 1 – GLOBAL CRUDE OIL PRODUCTION AND CONSUMPTION<br />
CHART 2 – CRUDE OIL PRICE MOVEMENT VIS-À-VIS INVENTORY LEVELS<br />
CHART 3 – GLOBAL NATURAL GAS PRODUCTION AND CONSUMPTION<br />
CHART 4 – AVERAGE RIGS DEPLOYED<br />
CHART 5 – WELDED TUBES PRODUCTION VIS-À-VIS CRUDE OIL PRICE<br />
CHART 6 – MOVEMENT OF PLANNED PIPELINE PROJECTS VIS-À-VIS<br />
CRUDE OIL PRICE<br />
TABLE 2 – PIPELINES PLANNED AND UNDER CONSTRUCTION<br />
DOMESTIC SCENARIO<br />
TABLE 3 – EXISTING OIL &amp; GAS PIPELINE NETWORK<br />
NATURAL GAS<br />
CHART 8 – DOMESTIC GAS AVAILABILITY VIS-À-VIS DEMAND<br />
TABLE 4 – PLANNED DOMESTIC PIPELINE PROJECTS<br />
WATER/SANITATION SECTOR<br />
TABLE 5 – WATER/SANITATION PROJECTS<br />
DOMESTIC TRENDS AND OUTLOOK<br />
CHART 9 – PRODUCTION VIS-À-VIS DOMESTIC CONSUMPTION<br />
INTRODUCTION TO PIPES – A PRIMER<br />
SEAMLESS PIPES<br />
SAW PIPES<br />
LSAW PIPES<br />
HSAW PIPES<br />
WELDED (ELECTRIC RESISTANCE WELDED (ERW) AND ELECTRIC<br />
FUSION WELDED<br />
(EFW)) PIPES<br />
DUCTILE IRON (DI) PIPES<br />
GLOBAL PIPE INDUSTRY<br />
DEMAND SCENARIO IN THE ENERGY SEGMENT<br />
ENERGY DEMAND TO GROW AT A CAGR OF 1.4%<br />
OVERALL OIL &amp; GAS CAPEX EXPECTED TO INCREASE IN 2010 DRIVEN BY NOCS’ INVESTMENTS<br />
ROBUST OUTLOOK FOR GLOBAL DEMAND FOR PIPELINES<br />
REPLACEMENT DEMAND FROM THE US ALSO REMAINS STRONG<br />
DEMAND SCENARIO IN THE WATER SEGMENT<br />
GLOBAL DEMAND FOR PLASTIC PIPES TO RISE<br />
WASTE &amp; WATER PIPE DEMAND IN US<br />
INDIAN PIPE INDUSTRY<br />
INDIAN DEMAND FOR PIPES EXPECTED TO BE STRONG<br />
ENERGY SEGMENT<br />
LOW PIPELINE PENETRATION IN INDIA PROVIDES HUGE POTENTIAL<br />
INCREASING SHARE OF NATURAL GAS IN ENERGY DEMAND<br />
WITH PETROLEUM &amp; NATURAL GAS REGULATORY BOARD IN ACTION,<br />
TRUNK PIPELINES TO RECEIVE BOOST<br />
SWOT – INDIAN PIPE INDUSTRY<br />
SALIENT FEATURES OF THE INDIAN PIPE INDUSTRY<br />
INDIAN MANUFACTURERS HAVE A COST ADVANTAGE<br />
ORDER BOOK POSITION LOOKS ROBUST<br />
CAPACITY UTILIZATION RANGES BETWEEN 25–60%<br />
MARKET POSITION<br />
DOMESTIC DEMAND DRIVERS<br />
CAPACITY EXPANSION BY DOMESTIC PLAYERS<br />
HUGE INVESTMENTS IN THE SOUTH/EAST INDIA<br />
STEEL PIPES MARKET OVERVIEW<br />
MARKET SIZE &amp; FORECAST<br />
GROWTH DRIVERS &amp; CHALLENGES<br />
PLANT LAYOUT<br />
MANUFACTURERS/SUPPLIERS OF M.S ERW PIPE<br />
SUPPLIERS OF RAW MATERIALS<br />
M.S STRIP COILS<br />
RESSISTANCE WELDING ELECTRODE<br />
WELDING ELECTRODES<br />
PICKLING CHEMICALS<br />
PACKING MATERIALS<br />
SUPPLIERS OF PLANT AND EQUIPMENTS<br />
TUBE MILL<br />
SUBMERGED ARC WELDING EQUIPMENT<br />
THREE ROLLER BENDING MACHINE<br />
PLATE BENDING MACHINE<br />
PIPE CUTTING MACHINE<br />
PIPE STRAIGHTENING MACHINE<br />
HYDROTESTING EQUIPMENT<br />
BEND TESTING EQUIPMENT<br />
POWDER COATING MACHINE<br />
SUPPLIERS OF ERW PIPE AND TUBE PLANT<br />
SUPPLIERS OF HIGH FREQUENCY INDUCTION WELDER<br />
EOT CRANE<br />
POWER TRANSFORMER<br />
ELECTRICAL PANEL<br />
ELECTRIC MOTOR<br />
COOLING TOWER<br />
EFFLUENT TREATMENT PLANT (ETP PLANT)<br />
AIR POLLUTION CONTROL EQUIPMENTS<br />
AIR CONDITIONING EQUIPMENTS<br />
AIR COMPRESSORS<br />
PLATFORM WEIGHING MACHINE<br />
MATERIAL HANDLING EQUIPMENTS<br />
FIRE FIGHTING EQUIPMENTS<br />
SHOT BLASTING MACHINE<br />
JIGS AND FIXTURE<br />
SUBMERSIBLE WATER PUMP</p>
<p>APPENDIX – A:</p>
<p>01. PLANT ECONOMICS<br />
02. LAND &amp; BUILDING<br />
03. PLANT AND MACHINERY<br />
04. OTHER FIXED ASSESTS<br />
05. FIXED CAPITAL<br />
06. RAW MATERIAL<br />
07. SALARY AND WAGES<br />
08. UTILITIES AND OVERHEADS<br />
09. TOTAL WORKING CAPITAL<br />
10. TOTAL CAPITAL INVESTMENT<br />
11. COST OF PRODUCTION<br />
12. TURN OVER/ANNUM<br />
13. BREAK EVEN POINT<br />
14. RESOURCES FOR FINANCE<br />
15. INSTALMENT PAYABLE IN 5 YEARS<br />
16. DEPRECIATION CHART FOR 5 YEARS<br />
17. PROFIT ANALYSIS FOR 5 YEARS<br />
18. PROJECTED BALANCE SHEET FOR (5 YEARS)</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-and-spiral-welded-pipe/">ERW AND SPIRAL WELDED PIPE</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ERW PIPES AND TUBES PLANT</title>
		<link>https://projectreports.eiriindia.org/product/erw-pipes-and-tubes-plant-2/</link>
		
		<dc:creator><![CDATA[EIRI Team]]></dc:creator>
		<pubDate>Wed, 01 May 2019 06:16:26 +0000</pubDate>
				<guid isPermaLink="false">https://projectreports.eiriindia.org/?post_type=product&#038;p=12814</guid>

					<description><![CDATA[<p>Electric resistance welded (ERW) pipe is manufactured by cold-forming a sheet of steel into a cylindrical shape. Current is then passed between the two edges of the steel to heat the steel to a point at which the edges are forced together to form a bond without the use of welding filler material. Initially this manufacturing process used low frequency A.C. current to heat the edges. This low frequency process was used from the 1920’s until 1970. In 1970, the low frequency process was superseded by a high frequency ERW process which produced a higher quality weld.</p>
<p>Over time, the welds of low frequency ERW pipe was found to be susceptible to selective seam corrosion, hook cracks, and inadequate bonding of the seams, so low frequency ERW is no longer used to manufacture pipe. The high frequency process is still being used to manufacture pipe for use in new pipeline construction</p>
<p>ERW steel pipes &#38; tubes find widespread usage across industries and fields. In addition to various engineering industries, they are used for water, oil and gas distribution, line pipes, fencing, scaffolding, etc. They are also used for agricultural purposes, drinking water supply, thermal power, for hand pumps for deep boring wells and also as protection for cables (telecom), among others. Depending on the requirement of the end user industry, ERW steel pipes &#38; tubes are available in various wall thicknesses, diameters, and qualities. The different types include line precision pipes, tubular poles, electric poles, lightweight galvanized pipes for sprinkler irrigation, among others. The industry has sufficient capacity to manufacture the different types of pipes &#38; tubes. High performance ERW steel pipes &#38; tubes possess high strength, toughness and are corrosion resistant. In the manufacturing process of ERW steel pipes &#38; tubes, the edges to be welded are mechanically pressed together and electric resistance or electric induction is used to generate the heat required for welding. With the adoption of better welding technology, ERW pipes &#38; tubes are now widely used in the oil &#38; gas sector. A number of ERW steel pipes &#38; tubes production units are in the SSI sector. Higher demand from the oil &#38; gas industry, infrastructure and automobile industries has led to a healthy increase in production of ERW steel pipes.</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-pipes-and-tubes-plant-2/">ERW PIPES AND TUBES PLANT</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>INTRODUCTION<br />
IMPLEMENTATION OF SCHEDULE OF ACTIVITY OF PROJECT<br />
TYPES OF ERW PIPE<br />
(1) LOW-FREQUENCY-WELDED ERW (LF-ERW) PIPE<br />
(2) HIGH-FREQUENCY-WELDED ERW (HF-ERW) PIPE<br />
(3) DIRECT-CURRENT-WELDED ERW (DC-ERW) PIPE<br />
PHYSICAL PROPERTIES OF PIPING MATERIALS<br />
MALLEABILITY<br />
DUCTILITY<br />
BRITTLENESS<br />
ELASTICITY<br />
CONDUCTIVITY<br />
CHEMICAL RESISTANCE/RESISTANCE TO CORROSION<br />
PROPERTIES<br />
ADVANTAGES OF ERW PIPE<br />
USES AND APPLICATION<br />
B.I.S. SPECIFICATION<br />
MARKET POSITION<br />
DOMESTIC DEMAND DRIVERS<br />
CAPACITY EXPANSION BY DOMESTIC PLAYERS<br />
HUGE INVESTMENTS IN THE SOUTH/EAST INDIA<br />
EXPORT DATA OF ERW STEEL PIPE<br />
IMPORT DATA OF ERW STEEL PIPE<br />
MANUFACTURERS/SUPPLIERS OF M.S ERW PIPE<br />
PROCESS FLOW CHART<br />
PROCESS FLOW CHART FOR HOT DIP GALVANISING<br />
MANUFACTURING PROCESS<br />
1. UNCOILED, LAVELED AND WELDING OF STRIP<br />
2. STRIPPING<br />
3. LOOPING<br />
4. EDGE TRIMMING<br />
5. FORMING<br />
6. WELDING<br />
7. BEAD TRIMMING<br />
8. SIZING<br />
9. CUTTING<br />
10. NORMALISING<br />
11. END FACING AND BEVELLING<br />
12. TESTING<br />
ULTRASONIC TESTING<br />
EDDY-CURRENT TESTING<br />
HYDROSTATIC TESTING<br />
MAGNETIC PARTICLE TESTING<br />
RADIOGRAPHIC (X-RAY) TESTING<br />
DYE-PENETRANT TEST<br />
14. MARKING<br />
(15) HOT DIP GALVANISING PROCESS<br />
(A) CONTINIOUS GALVANISING<br />
MAIN STEPS IN CONTINIOUS GALVANISING LINE<br />
(A) PREPARATION OF BLACK COILS<br />
(B) CLEANING<br />
(C) ANNEALING AND COOLING<br />
(D) ZINC BATH MANAGEMENT AND ALLOYING REACTIONS<br />
(E) COATING WEIGHT [MASS] CONTROL AND MEASUREMENT<br />
(F) POST TREATMENTS<br />
TEMPER PASSING<br />
LEVELING<br />
CHEMICAL TREATMENT<br />
INSPECTION<br />
OILING AND RECOILING<br />
(B) BATCH GALVANISING<br />
ZINC BATH COMPOSITION FOR BATCH PROCESS<br />
PART THICKNESS<br />
STEPS IN GALVANISING<br />
(A) PREPARATION<br />
CAUSTIC CLEANING –<br />
PICKLING –<br />
FLUXING –<br />
DRYING –<br />
(B) GALVANISING<br />
(C) POST TREATMENT<br />
SOURCES OF WASTE<br />
WASTE MANAGEMENT IN GALVANISING PROCESS<br />
TYPES OF WASTE<br />
I) ACID WASTE<br />
II) FLUX WASTE<br />
III) DROSS<br />
IV) ASH<br />
V) BAG FILTER DUST<br />
VI) GENERAL AND OTHER WASTES<br />
LIMIT OF POLLUTION IN HOT DIP GALVANISING PROCESS<br />
AIR POLLUTION CONTROL MEASURES FOR ACID FUMES<br />
PLANT AND MACHINERY<br />
(1) UNCOILER<br />
(2) LAVELER<br />
(3) SHEAR AND WELDER<br />
(4) ACCUMULATOR<br />
(5) FORMING AND SIZING SECTION<br />
(5) HF SOLID STATE WELDER<br />
HIGH QUALITY WELDING SEAM.<br />
1. SWITCHGEAR RECTIFYING CABINET<br />
2. INVERTER OUTPUT CABINET<br />
3. CONNECTING OPTICAL FIBER<br />
4. CIRCULATION SOFT WATER COOLING SYSTEM<br />
5. CENTRAL OPERATION CONSOLE<br />
6. MECHANICAL ADJUSTMENT DEVICE<br />
(6) ANNEALING FURNACE<br />
(7) FLYING SAW<br />
MAIN SPECIFICATION:<br />
FLYING SAW ALL DIGITAL CONTROL SYSTEM<br />
(8) FACING AND BEVELING MACHINE<br />
(9) STRAIGHTNER MACHINE<br />
(10) THREADING MACHINE<br />
(11) HYDRAULIC TESTING MACHINE<br />
1) FOR ERW TUBE AND SEAMLESS TUBE<br />
2) FOR LARGER DIAMETER PIPE (HSAW AND LSAW PIPES)<br />
PLANT LAYOUT<br />
SUPPLIERS OF RAW MATERIALS<br />
M.S STRIP COILS<br />
RESSISTANCE WELDING ELECTRODE<br />
PICKLING CHEMICALS<br />
ZINC INGOT<br />
CASTIC SODA<br />
HYDROCLORIC ACID<br />
ZINC AMONIUM CLORIDE<br />
DEGREASING CHEMICAL<br />
PHOSPHATING CHEMICALS<br />
SUPPLIERS OF PLANT AND MACHINERIES<br />
ERW PIPE AND TUBE PLANT<br />
HIGH FREQUENCY INDUCTION WELDER<br />
EOT CRANE<br />
DG SETS<br />
POWER TRANSFORMERS<br />
COOLING TOWER<br />
ETP PLANTS<br />
AIR POLLUTION CONTROL EQUIPMENTS<br />
AIR COMPRESSORS<br />
PLATFORM WEIGHING MACHINE<br />
MATERIAL HANDLING EQUIPMENTS<br />
NDT INSPECTION EQUIPMENT<br />
FIRE FIGHTING EQUIPMENTS<br />
ELECTRICAL MEASURING INSTRUMENTS<br />
SUBMERSIBLE WATER PUMP<br />
LIST OF PLANT &amp; MACHINERY<br />
UTILITY EQUIPMENTS</p>
<p>APPENDIX – A:</p>
<p>1. COST OF PLANT ECONOMICS<br />
2. LAND &amp; BUILDING<br />
3. PLANT AND MACHINERY<br />
4. FIXED CAPITAL INVESTMENT<br />
5. RAW MATERIAL<br />
6. SALARY AND WAGES<br />
7. UTILITIES AND OVERHEADS<br />
8. TOTAL WORKING CAPITAL<br />
9. COST OF PRODUCTION<br />
10. PROFITABILITY ANALYSIS<br />
11. BREAK EVEN POINT<br />
12. RESOURCES OF FINANCE<br />
13. INTEREST CHART<br />
14. DEPRECIATION CHART<br />
15. CASH FLOW STATEMENT<br />
16. PROJECTED BALANCE SHEET</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-pipes-and-tubes-plant-2/">ERW PIPES AND TUBES PLANT</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ERW PIPES MANUFACTURING</title>
		<link>https://projectreports.eiriindia.org/product/erw-pipes-manufacturing/</link>
		
		<dc:creator><![CDATA[EIRI Team]]></dc:creator>
		<pubDate>Wed, 18 Mar 2015 09:50:25 +0000</pubDate>
				<guid isPermaLink="false">http://projectreports.eiriindia.org/?post_type=product&#038;p=4604</guid>

					<description><![CDATA[<p style="text-align: justify;">     Pipes and tubes find use in almost all the industries/services in one way or the other. Automobile vehicles use metallic pipes, including steel pipes, of a large  variety. Gas/water/liquids transporting pipes are spread everywhere. Irrigation,     petroleum products, sewerage, chemicals transportation pipes and those used in mines, public water supply networks, are well known.</p>
<p>Hydraulic piping may be divided into (i) rigid &#38;  (ii) flexible classes.</p>
<p>Rigid piping of iron &#38; steel is either seamless or welded type. Pipes have specified end-threading pipe-fittings in the piping net-work. The following  common tube  sizes, their bend=radii &#38; other pertinent data, are taken care  of  by  pipe manufacturers.</p>
<p>APPENDIX – A :</p>
<p>1.      COST OF PLANT ECONOMICS<br />
2.      LAND &#38; BUILDING<br />
3.      PLANT AND MACHINERY<br />
4.      FIXED CAPITAL INVESTMENT<br />
5.      RAW MATERIAL<br />
6.      SALARY AND WAGES<br />
7.      UTILITIES AND OVERHEADS<br />
8.      TOTAL WORKING CAPITAL<br />
9.      COST OF PRODUCTION<br />
10.      PROFITABILITY ANALYSIS<br />
11.      BREAK EVEN POINT<br />
12.      RESOURCES OF FINANCE<br />
13.      INTEREST CHART<br />
14.      DEPRECIATION CHART<br />
15.      CASH FLOW STATEMENT</p>
<p>The post <a href="https://projectreports.eiriindia.org/product/erw-pipes-manufacturing/">ERW PIPES MANUFACTURING</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://projectreports.eiriindia.org/product/erw-pipes-manufacturing/">ERW PIPES MANUFACTURING</a> appeared first on <a href="https://projectreports.eiriindia.org">EIRI - eBooks and Project Reports</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
