ABC CABLE FACTORY
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
Aerial Bunched Cables (ABC) is a very novel concept for Over Head Power distribution. When compared to the conventional bare conductor over head distribution system. ABC provides higher safety and reliability, lower power losses and ultimate system economy by reducing installation, maintenance and operative cost. This system is ideal for rural distribution and specially attractive for installation in difficult terrains such as hilly areas, forest areas, coastal areas etc.
Aerial Bunched Cables is also considered to be the best choice for power distribution congested urban areas with narrow lanes and by – lanes. In developing urban complex, Aerial Bunched Cables is the better choice because of flexibility for rerouting as demanded by changes in urban development plan.
• INTRODUCTION
• ADVANTAGES
• DISADVANTAGES
• USES AND APPLICATION
• MARKET POSITION
• THE SWOT ANALYSIS:
• MARKET STUDY AND PLANT CAPACITY
• US DEMAND TO RISE 5.8% ANNUALLY THROUGH 2017
• MARKET STUDY AND PLANT CAPACITY IN NAMBIA
• MANUFACTURERS/SUPPLIERS ABC CABLES
• MANUFACTURING PROCESS OF ABC CONDUCTOR
• CONSTRUCTION
• MATERIAL
• PROCESS
• STRANDING
• INSULATION
• DEGASSING
• QUALITY CONTROL
• PROCESS OF ANNEALING TEST FOR WIRES AND CONDUCTORS
• TENSILE TEST OF CONDUCTORS
• APPARATUS REQUIRED FOR TENSILE TEST
• METHOD OF TENSILE TEST OF CONDUCTORS
• PROCEDURE
• PERSULPHATE TEST OF CONDUCTOR
• WHY COPPER WIRES ARE TINNED?
• METHODS
• WRAPPING TEST FOR CONDUCTORS
• PROCEDURE
• PROCESS FLOW CHART FOR ABC CONDUCTOR
• PLANT LAYOUT
• SUPPLIERS OF PLANT MACHINERY
• CHINA SUPPLIERS OF ABC CABLE MAKING MACHINE
• SUPPLIERS XLPE RXTRUSION LINE
• SUPPLIERS OF CABLE LAYING UP MACHINE
• SUPPLIERS OF RAW MATERIALS
• SUPPLIERS OF ALUMINIUM CONDUCTOR
• SUPPLIERS OF XLPE COMPOUND
APPENDIX – A :
1. COST OF PLANT ECONOMICS
2. LAND & BUILDING
3. PLANT AND MACHINERY
4. FIXED CAPITAL INVESTMENT
5. RAW MATERIAL
6. SALARY AND WAGES
7. UTILITIES AND OVERHEADS
8. TOTAL WORKING CAPITAL
9. COST OF PRODUCTION
10. PROFITABILITY ANALYSIS
11. BREAK EVEN POINT
12. RESOURCES OF FINANCE
13. INTEREST CHART
14. DEPRECIATION CHART
15. CASH FLOW STATEMENT
16. PROJECTED BALANCE SHEET