Description
INTRODUCTION
TYPICAL PROPERTIES
PERFORMANCE PROPERTIES
VISCOSITY IN 9.5% HCL
USES AND APPLICATION
PROPERTIES, STORAGE AND HANDLING OF ACID THICKENER
TYPICAL PHYSICAL PROPERTIES
PROCEDURE FOR USE
STORAGE AND HANDLING
PACKAGING
MARKET OVERVIEW OF TOILET CORE PRODUCTS
THICKENING SURFACTANTS FOR ACIDIC SOLUTION
FORMULATION OF ACID THICKNER
FORMULATION NO. 1
FORMULATION -2
FORMULATION -3
MANUFACTURING PROCESS OF ACID THICKENER
PROCESS OF ETHOXYLATION
PROCESS FLOW DIAGRAM
FORMULATION OF ACID TOILET BOWL CLEANER
PRODUCTION METHOD OF ACID THICKENERS
PREPARATION OF THE GELLING AGENT
PROCEDURE
FORMULATING HINTS FOR ACID THICKENERS
MATERIAL SAFETY DATA SHEET OF TOILET CLEANER
IRRITANT.
SAFETY PHRASES
COMPOSITION/INFORMATION ON INGREDIENTS
FIRST AID MEASURES (SYMPTOMS)
DESCRIPTION OF FIRST AID MEASURES
MOST IMPORTANT SYMPTOMS AND EFFECTS, BOTH ACUTE AND DELAYED
INDICATION OF ANY IMMEDIATE MEDICAL ATTENTION AND SPECIAL TREATMENT NEEDED
FIRE-FIGHTING MEASURES
EXTINGUISHING MEDIA
SPECIAL HAZARDS ARISING FROM THE SUBSTANCE OR MIXTURE
ADVICE FOR FIRE-FIGHTERS
ACCIDENTAL RELEASE MEASURES
ENVIRONMENTAL PRECAUTIONS
METHODS AND MATERIAL FOR CONTAINMENT AND CLEANING UP
HANDLING AND STORAGE
PRECAUTIONS FOR SAFE HANDLING
CONDITIONS FOR SAFE STORAGE, INCLUDING ANY INCOMPATIBILITIES
EXPOSURE CONTROLS/PERSONAL PROTECTION
CONTROL PARAMETERS
EXPOSURE CONTROLS
PHYSICAL AND CHEMICAL PROPERTIES
INFORMATION ON BASIC PHYSICAL AND CHEMICAL PROPERTIES
TOXICOLOGICAL INFORMATION
TOXICITY
PERSISTENCE AND DEGRADABILITY
MOBILITY IN SOIL
DISPOSAL CONSIDERATIONS
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY
2. MARKETS
3. POWER AND FUEL SUPPLY
4. WATER SUPPLY
5. CLIMATE
6. TRANSPORTATION
7. WASTE DISPOSAL
8. LABOR
9. REGULATORY LAWS
10. TAXES
11. SITE CHARACTERISTICS
12. COMMUNITY FACTORS
13. VULNERABILITY TO WARTIME ATTACK
14. FLOOD AND FIRE CONTROL
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION
2. FIXED ASSETS
3. WORKING CAPITAL
4. BREAK-EVEN POINT
5. OTHER FIXED EXPENSES
6. MARGIN MONEY
7. TERM LOANS
8. TOTAL LOAD
9. LAND AREA/MAN POWER RATIO
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
PLANT LAYOUT
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF LABORATORY CHEMICALS
SUPPLIERS OF PACKAGING MATERIALS
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF REACTION VESSEL
SUPPLIERS OF STORAGE VESSELS
SUPPLIERS OF FILTER PRESS
SUPPLIERS OF LABORATORY EQUIPMENTS
SUPPLIERS OF INSTRUMENTATION & PROCESS CONTROL EQUIPMENTS
SUPPLIERS OF PACKAGING MACHINE
SUPPLIERS OF D.G. SETS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)