The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Carbon  is propabably the most widely distributed element  in nature.   It  occurs in two allotropic  crystalline  forms,  viz. graphite  (hexagonal  system) and dimond (isomeric  system),  the former  is soft and black white diamond is hard and  transparent.  Charcoal  coke and carbon black, classified as amorphous  carbon, are  considered by same to represent a third form, they are  said to  be  composed of very minute crystals of graphite  by  others.  Carbon  is an essential constitutent of all vegetable and  animal matter  in  which  constitutent and  other  elements  in  immense variety       of       Oxygen      and       other       elements
compounds.    In   combinations  with  hydrogen  it   occurs   as hydrocarbons in petroleum.  It is also found in carbon dioxide in air (0.03%), as sodium bicarbonates in sea water, and as  calcium and  magnesium carbonates in sedimentary rocks such as chalk  and
dolamite.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

3.00 MT/Day

Land & Building

Area 2 Acres Rs. 2.16 Cr

Plant and Machinery

Rs. 40.00 Lacs

Working Capital for 1 Month

Rs. 26.66 Lacs

Total Capital Investment

Rs. 2.90 Cr

Rate of Return

34%

Break Even Point

50%