AIR CONDITIONERS & PARTS (WINDOW TYPE)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The early attempts at air conditioning were aimed solely  at providing human comfort.  Coider fields were sought to be covered in the nineteenth century, and it was during this period that the foundation   of  modern  air  conditioning  was  laid  with   the controlling  of humidity conditions in cotton textiles mills.  In the  initial stages, the air in the textile mills was  humidified by  evaporating  water  from  steam  ports  in  order  to  reduce breakages and static electricity of cotton yarns. The  principles of   air conditioning were then gradually extended to  industries like   printing.   Candy   making,   wood   production,   tobacco manufacturing,  and to  the storage of food and other  perishable products.  By 1897, the first form of humidification,  namely  an air washer, was patented and used on a wider scale. It cooled and humidified  in addition to its primary function of  cleaning  the air.

Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

3.00 Nos/Day

Land and Building

Area 2000 Sq.mtrs. Rs. 1.43 Cr

Plant & Machinery

Rs. 29.32 Lacs

Working Capital 3 Months

Rs. 46.39 Lacs

Total Capital Investment

Rs. 2.34 Cr

Rate of Return

13%

Break Even Point

65%