Aluminium Alloy Ingots

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Building and construction traus postation equipment die-cost auto   parts  electrical  industry (power transmission lines) photoengraving  plates permanent  magnets   eryogenic  technology machinery  and  accessory equipment  containers  for fissionable rector fuels, tubes for ointment tooth paste, shaving cream etc. As powder in paints  and  protective  coating rocket fuel, ingredient of incendiary mixture (thermite) as a caralyst  foamed concrete  vacuum  metallizing and coating. As foil packaging cooking decorative stamping.  As blakes for insulation of  liquid fuels shipping.

Project Report covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •     Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

18 Ton/Day

Land and Building (4000 Sq. Mtr)

Rs. 6 Cr.

Plant and Machinery

Rs. 2.30 Cr.

Working Capital (2 Month)

Rs. 15 Cr.

Total Capital Investment

Rs. 24 Cr.

Rate of Return (%)

55%

Break Even Point

35%