ALUMINIUM ALLOY PLANT

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Aluminium containing variable amounts of manganese, silicon, copper, Magnesium, lead bismuth, nickel, chromium, zinc ortin.  A wide range of uses and properties is possible.  Always  may  be obtained  for  costing  or working  heat  treatable  or  non-heat treatable  with  a wide range of  strength  corrosion  resistance machinability and weldability.

The Latin in name  Alumen was  employed  by  pliny.   The chemical Alum had been used for car tarius but it was not until 1922 that French Hoffman concluded from experiments that the book of  alum was a true and distinct Earth.  Before the end of that century the name of the earth had been anglicized to Alumina.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

100.00 MT/Day

Land & Building

Area 2500 Sq.Mtr US$ 3.24 Lacs

Plant and Machinery

US$ 3.43 Lacs

Working Capital for 2 Months

US$ 1.06 Cr

Total Capital Investment

US$ 1.13 Cr

Rate of Return

68%

Break Even Point

25%