Aluminum Label Printing

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Cracking  of  the  gun-arabic  film  on   varnish impregnated

aluminium,  e.g for transparencies. This fault is identical  with

the  cracking  of  short  oil varnish  film  on  long  oil  under

coatings.  The gun layer really takes the place of a  very  short

oil resin film.

Label  varnishes  dry quickly without penetrating  into  the

aluminium  and  other  metal etc. while on  account  of  its  oil

content  and also of two sided application,  transparent  varnish

can penetrate completely.

Project Reports Cover:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

780.00 Ft/day

Land & Building

Area 600 Sq.Mtrs. Rs 89.75 Lacs

Plant and Machinery

Rs.57.30 Lacs

Working Capital for 3 Months

Rs. 1.09 Cr

Total Capital Investment

Rs. 2.71 Cr

Rate of Return

55%

Break Even Point

33%