AMUSEMENT PARK

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The  Human  life  in  cities  is  becoming  more  and  more mechanical because of noise pollution, environment pollution  for relaxed  and  peaceful  environment,  where  leisure  along  with children and family.  There are various sources of  entertainment like  cinema,  circus, tourist spots, videogame,  orchestra  etc.  Amusement  park is the most popular entertaining place  with  the latest technological developments, which gives comfort, pleasure.  Apart  from  this  it also give awareness  of  the  technological developments.  Amusement park are not only must for children  but also  for elderly peoples.  Especially children  derived  maximum pleasure  and  happiness from the amusement parks.  It  is  worth
while  to spend luxury summer evening and cold, winters  days  in amusement parks.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

Amuesment Park

Land & Building

Area 6 Acres Rs. 10.44 Cr

Plant and Machinery

Rs. 19.02 Cr

Working Capital for 1 Month

Rs. 79.06 Lacs

Total Capital Investment

Rs. 32.13 Cr

Rate of Return

74%

Break Even Point

30%