AUTOMOBILE WORKSHOP AND SERVICE CENTRE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

A  limited  nos.  of  manufacturers  of  various  types   of automobile  vehicles  in India  had their limited  capacities  of production
Ashok  Leyland
Hindustan Motors
Models  designs were changed rarely.  Hence  these  vehicles either  could  does not attract or could not reach  the  aspiring purchasers.   A  revolution has come in the  automobile  industry with the introduction of light vehicles manufactured by

1.   INTRODUCTION
2.   PROPERTIES
3.   USES & APPLICATION
4.   MARKET POTENTIAL
5.   MANUFACTURING PROCESS
6.   HYDRAULIC HOIST
7.   A TROUBLE SHOORING CHART WHICH
INCORPORATES THE SCIENTIFIC METHOD
8.   PROCESS FLOW DIAGRAM
9.   PLANT LAY-OUT
10.  PLANT AND MACHINERY
11.  RAW MATERIAL SUPPLIERS

APPENDIX – A :

1.      COST OF PLANT ECONOMICS
2.      LAND & BUILDING
3.      PLANT AND MACHINERY
4.      FIXED CAPITAL INVESTMENT
5.      RAW MATERIAL
6.      SALARY AND WAGES
7.      UTILITIES AND OVERHEADS
8.      TOTAL WORKING CAPITAL
9.      COST OF PRODUCTION
10.      PROFITABILITY ANALYSIS
11.      BREAK EVEN POINT
12.      RESOURCES OF FINANCE
13.      INTEREST CHART
14.      DEPRECIATION CHART
15.      CASH FLOW STATEMENT
16.      PROJECTED BALANCE SHEET

Additional information

Plant Capacity

Automobile Workshop and Service Centre

Land & Building

(2500 Sq.Mtr) Rs. 64.70 Lacs

Plant and Machineries

Rs. 86.40 Lacs

Working Capital for 3 Months

Rs. 87.11 Lacs

Total Capital Investment

Rs. 2.67 Cr

Rate of Return

33%

Break Even Point

68%