Description
INTRODUCTION
ADHESIVE BANDAGE
TYPICAL ADHESIVE BANDAGE
REVERSE OF AN ADHESIVE BANDAGE, SHOWING BACKING
PROPERTIES
USES AND APPLICATIONS
ADHESIVE BANDAGE
B.I.S. SPECIFICATION
DIFFERENT TYPES OF ADHESIVE BANDAGE
DURABILITY
ADHESION
BREATHABILITY
UNDERSTANDING THE DIFFERENCE BETWEEN PLASTIC, CLEAR AND SHEER ADHESIVE BANDAGES:
UNDERSTANDING THE DIFFERENT ADHESIVE BANDAGE SUBSTRATES:
BEST ADHESIVE BANDAGES FOR THE INDUSTRIAL, MEDICAL AND CONSUMER MARKETS
FLEXIBLE FABRIC ADHESIVE BANDAGES
SOFT FLEXIBLE FABRIC ADHESIVE BANDAGES
HEAVYWEIGHT FLEXIBLE FABRIC ADHESIVE BANDAGES
LIGHTWEIGHT FLEXIBLE FABRIC ADHESIVE BANDAGES
TRICOT ADHESIVE BANDAGES
SUPER FLEX™ FOAM ADHESIVE BANDAGES
CLEAR WATERSEAL™ ADHESIVE BANDAGES
SUPER STRIP WATERSEAL™ ADHESIVE BANDAGES
SENSITIVE SKIN ADHESIVE BANDAGES
MARKET OVERVIEW OF ADHESIVE BANDAGE
MANUFACTURERS/SUPPLIERS OF BAND AIDS
MANUFACTURING PROCESS OF BAND-AID (JOHNSON & JOHNSON TYPE)
FORMLATION FOR BAND-AID ADHESIVES
NOW AS PER THE FOLLOWING FORMULATION
PROCESS FLOW SHEETS
DETAILS OF ADHESIVE BANDAGE MANUFACTURING
FIGURE: ADHESIVE BANDAGE PRODUCTION MACHINE
TEST OF MATERIALS
TEST PROCEDURE FOR ADHESIVE BANDAGE PERFORMANCE
MECHANICAL PROPERTIES OF ADHESIVE BANDAGE
PRINCIPLES OF PLANT LAYOUT
STORAGE LAYOUT:
EQUIPMENT LAYOUT:
SAFETY:
PLANT EXPANSION:
FLOOR SPACE:
UTILITIES SERVICING:
BUILDING:
MATERIAL-HANDLING EQUIPMENT:
RAILROADS AND ROADS:
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
COMPLETE PLANT AND MACHINERIES SUPPLIERS [AUTOMATIC]
ADDRESSES OF PLANT & MACHINERY SUPPLIERS
SUPPLIERS OF MIXER/BLENDERS
SUPPLIERS OF DRYER
AUTOMATIC COATING MACHINE & SLITTING MACHINE
ADDRESSES OF RAW MATERIAL SUPPLIERS
SUPPLIERS OF BENZAL KONIUM CHLORIDE
SUPPLIERS OF ACETONE
SUPPLIERS OF ADHESIVE FOR BAND AID
SUPPLIERS OF RELEASE PAPER
SUPPLIERS OF COTTON CLOTH
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)