Description
INTRODUCTION
PRECAUTION WHILE BINDING
PURPOSE OF USING BINDING WIRE:
READY-MADE BINDING WIRE ADVANTAGES:
BENEFITS OF BINDING WIRE IN CONSTRUCTION:
THE BENEFITS OF BINDING WIRES IN CONSTRUCTION ARE
NUMEROUS AS GIVEN BELOW:
SPECIFICATION OF BINDING WIRE
DIAMETER & SPECIFICATIONS:
BENEFITS OF BINDING WIRES:
BINDING WIRE
QUALITY/SPECIFICATION
FORMS OF SUPPLY
CONSTRUCTION BINDING WIRE (GALV. AND BLACK) POPULAR SIZES:
PACKING:
G. I. (GALVANIZED IRON) BINDING WIRE FOR REINFORCEMENT
CONSTRUCTION PC STRAND WIRE TYING STEEL COIL WIRES
USES AND APPLICATION
APPLICATION:
BINDING WIRE APPLICATIONS:
B.I.S. SPECIFICATION
CONCRETE REINFORCEMENT
STEEL BARS AND WIRES FOR CONCRETEREIN FOR CEMENT
PROCESS FLOW CHART
WIRE DRAWING PROCESS
RAW MATERIAL
(1) INSPECTION OF RAW MATERIAL
(2) PREPARATION OF RAW MATERIAL
(A) MECHANICAL DESCALING OF WIRE ROD
(B) CHEMICAL DESCALING (PICKLING) OF WIRE ROD
(C) APPLICATION OF SOAP (LUBRICANT) CARRIER
(3) DRAWING
(A) DRY DRAWING OF WIRE
(B) WET DRAWING OF WIRE
(4) HEAT TREATMENT OF WIRE
(A) ANNEALING
BATCH ANNEALING OF LOW CARBON STEEL WIRE
CONTINUOUS (IN-LINE) ANNEALING OF LOW CARBON STEEL WIRE
(B) PATENTING
(4) INLINE PICKLING
(4) GALVANISING PROCESS
THE HOT DIP GALVANIZING PROCESS
SURFACE PREPARATION
BENEFITS OF HOT DIP GALVANIZED
(5) QUALITY CONTROL
STANDARDS:
GENERALREQUIREMENTS:
CHEMICAL COMPOSITION:
SUPPLY OF MATERIAL
CHEMICAL COMPOSITION
WRAPPING TEST
BEND TEST
COATING TEST
FREEDOM FROM DEFECTS
(7) PACKING
(8) MARKING
MARKET OVERVIEW
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE
SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF STEEL BENDING WIRE FOR CONSTRUCTION
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF MILD STEEL WIRE ROD
SUPPLIERS OF ZINC
SUPPLIERS OF CASTIC SODA
SUPPLIERS OF HYDROCHLORIC ACID
SUPPLIERS OF ZINC ANODE
SUPPLIERS OF DEGREASING CHEMICAL
SUPPLIERS OF PACKING MATERIALS
SUPPLIERS OF AMMONIUM CHLORIDE
SUPPLIERS OF ZINC CHLORIDE
CHINA SUPPLIERS FOR BENDING WIRE PLANT
INDIAN SUPPLIERS FOR BENDING WIRE PLANT
SUPPLIERS OF WIRE DRAWING MACHINES
SUPPLIERS OF WIRE STRAIGHTENING MACHINE
SUPPLIERS OF WIRE POINTING MACHINE
SUPPLIERS OF ANNEALING FURNACES
SUPPLIERS OF BULK BLOCK TYPE HEAVY DUTY WIRE DRAWING MACHINE
SUPPLIERS OF WIRE MAKING PLANT
SUPPLIERS OF BUTT WELDING MACHINE
SUPPLIERS OF BENCH GRINDER
SUPPLIERS OF DRILLING MACHINE
SUPPLIERS OF EOT CRANES
SUPPLIERS OF DG SETS
SUPPLIERS OF POWER TRANSFORMERS
SUPPLIERS OF COOLING TOWER
SUPPLIERS OF ETP PLANTS
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF PLATFORM WEIGHING MACHINE
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF ELECTRICAL MEASURING INSTRUMENTS
SUPPLIERS OF HOT DIP GALVANISING PLANT
SUPPLIERS OF ELECTROPLATING PLANT
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF NDT INSPECTION EQUIPMENT
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF ELECTRICAL MEASURING INSTRUMENTS
SUPPLIERS OF SUBMERSIBLE WATER PUMP
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)