Additional information
Plant Capacity | 750.00 Packets/Day |
---|---|
Land and Building | Area 2000 Sq.Mtrs. Rs. 6.20 Lacs |
Plant & Machinery | Rs. 65.00 Lacs |
Working Capital for 2 Months | Rs. 81.90 Lacs |
Total Capital Investment | Rs. 1.77 Cr |
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
In India the requirement of fertilizers is steeply increasing every year and is mainly supplied in the form of chemical fertilizers.
Chemical fertilizers mainly Urea, D.A.P. Super Phosphate, Potash, Zinc Sulphate etc. are being used since long back to boost the crop production which has adverse effects on soil biota thereby increasing the cost of cultivation. It also causes health and environmental hazards alongwith decline in productivity and quality of produce.
In nature there is a number of useful soil micro-organism which can help plants to get nutrients. Their utility can be enhanced with human intervention by selecting efficient organism culturing them and adding them to soil directly or through seeds. The cultured micro organism beneficial for crop growth and soil fertility packed in some carrier material for easy application in the field are called Biofertilizers.
Keeping in view the increasing demands and good prospects of biofertilizers M/s. Aaron Agro-Tech Private Limited have ventured to take up biofertilizers manufacturing project to enhance their existing production capacity of their product-Bio-azo-Gold.
Project Report Covers:
Plant Capacity | 750.00 Packets/Day |
---|---|
Land and Building | Area 2000 Sq.Mtrs. Rs. 6.20 Lacs |
Plant & Machinery | Rs. 65.00 Lacs |
Working Capital for 2 Months | Rs. 81.90 Lacs |
Total Capital Investment | Rs. 1.77 Cr |