Description
INTRODUCTION
CLASSIFICATION OR TYPES OF MOTOR
DC MOTOR
BRUSHLESS DC MOTORS WORK
WORKING OF DC MOTOR
ADVANTAGES OF DC MOTORS:
DISADVANTAGES OF DC MOTORS
TYPES OF DC MOTORS:
TYPES OF DC MOTORS
THE DC MOTORS ARE DIVIDED MAINLY TO:
BRUSHLESS D.C MOTOR
WORKING PRINCIPLE AND OPERATION OF BLDC MOTOR
CONSTRUCTION OF BLDC MOTOR
ROTOR
HALL SENSORS
TYPES OF BRUSHLESS DC MOTORS
INNER ROTOR DESIGN
OUTER ROTOR DESIGN
ADVANTAGES OF BRUSHLESS DC MOTOR
DISADVANTAGES OF BRUSHLESS DC MOTORS
DISADVANTAGES OF BLDC MOTOR
USES AND APPLICATIONS OF BLDC MOTORS
B.I.S. SPECIFICATION
PROCESS FLOW CHART
MANUFACTURING PROCESS OFBRUSHLESS D.C MOTOR
FABRICATION PROCESS OF STATOR
1. STAMPING
2. STACKING
3. SLOT INSULATION
4. WINDING
5. PREPPING
FABRICATION PROCESS OF ROTOR
ROTOR MAGNET
1. SHAFT MACHINING
2. HUB MACHINING
3. HUB MAGANET GLUING
4. BEARING PRESSING
FABRICATION OF HOUSING AND END BELL MANUFACTURING
ELECTRONICS MANUFACTURING:
ASSEMBLING OF BLDC MOTOR
TESTING OF BLDC MOTOR
CLASSIFICATION OF TEST
1. TYPE TESTS
2. ROTINE TESTS
3. PERFORMANCE TEST
(A) NO LOAD TEST
(B) OPEN CIRCUIT VOLTAGE RATIO ‘REST FOR WOUND
(C) ROTOR (SLIP RING) MOTORS
(D) LOCKED ROTOR TEST
(E) FULL LOAD TEST
(8) MARKING
MARKET POSITION
PRINCIPLES OF PLANT LAYOUT
STORAGE LAYOUT:
EQUIPMENT LAYOUT:
SAFETY:
PLANT EXPANSION:
FLOOR SPACE:
UTILITIES SERVICING:
BUILDING:
MATERIAL-HANDLING EQUIPMENT:
RAILROADS AND ROADS:
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
PLANT LAYOUT
SUPPLIERS OF BLDC MOTOR
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF CRNGO SILICON STEEL
SUPPLIERS OF INSULATION KRAFT PAPER
SUPPLIERS OF COPPER WINDING WIRE
SUPPLIERS OF PERMANENT MAGNET
SUPPLIERS OF MOTOR SHAFT
SUPPLIERS OF D.C MOTOR PARTS
SUPPLIERS OF BLDC HALL SENSOR CONTROLLER
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF MOTOR MAKING MACHINES
SUPPLIERS OF PRECISION MEASURING TOOLS
SUPPLIERS OF ELECTRICAL MEASURING AND TESTING EQUIPMENT
SUPPLIERS OF ELECTRICAL PANEL
SUPPLIERS OF COOLING TOWER
SUPPLIERS OF EFFULENT TREATMENT PLANT (ETP PLANT)
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF PLATFORM WEIGHING MACHINE
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF SHOT BLASTING MACHINE
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)