Description
INTRODUCTION
USES & APPLICATION
B.I.S. SPECIFICATION
OVERVIEW OF LIVE STOCKS IN INDIA
THE INDIVIDUAL PRODUCTS UNDER THIS SUB-HEAD ARE AS BELOW:
AREAS OF PRODUCTION:
INDIA FACTS AND FIGURES:
LIVE STOCKS SECTOR IN INDIA
GLOBAL ANIMAL FOOD MARKET
COMPOSITION OF BUFFALO MEAT
GENERAL DESCRIPTION, COMPOSITION, AND MEAT QUALITY OF CATTLE AND BUFFALO MEAT
METHODS OF SLAUGHTER
SOME OF THE NORMS
EVERY METHOD OUGHT TO FULFILL THE FOLLOWING CONDITIONS.
HUMANE SLAUGHTER
THE PRE-SLAUGHTER HANDLING
THE PRE-SLAUGHTER HANDLING…
SLAUGHTERING AND PROCESSING OF CATTLE
PRE-HANDLING OF CATTLE
STUNNING AND BLEEDING
DRESSING AND HIDE REMOVAL
EVISCERATION
CUTTING AND BONING
INSPECTION
BY-PRODUCTS
PRODUCTS AND BY-PRODUCTS FROM THE SLAUGHTER OF 400 KG CATTLE
BY-PRODUCT PROCESSING
SLAUGHTERING OF BUFFALO
SEQUENCES IN SHEEP AND BUFFALO PROCESSING PLANT
BLOOD PROCESSING SYSTEM
PROCESS FLOW DIAGRAM FOR BLOOD PROCESSING
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF PLANT AND MACHINERY
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)