• INTRODUCTION
• USES/APPLICATIONS
• NEED FOR THE PROJECT
• MARKET OVERVIEW
• PRODUCT SPECIFICATIONS/PROPERTIES
• HAZARDS
• BASIS
• FORMULATION/MATERIAL BALANCE
• PROCESS STEPS/CHEMICAL REACTIONS
• PROCESS DESCRIPTION/PROCESS SCHEMATIC
• RAW MATERIALS
• SUPPLIERS OF RAW MATERIALS
• WATER/POWER/EFFLUENT (ESTIMATED)
• STORAGE DETAILS (ESTIMATED) – PROCESS FLUID
• ENGINEERING DESIGN CONSIDERATIONS
• ETP FACILITY
• SEWAGE AND WASTE WATER EFFLUENT
• WASTE GENERATION & MANAGEMENT/GREEN BELT
• FUEL CONSUMPTION (ESTIMATED) & EMISSION CONTROL
• DESIGN/PROJECT CONSULTANTS (BROADLY)
• PLANT/MACHINERY (BROADLY)
• PRINCIPLES OF PLANT LAYOUT
• PLANT LOCATION FACTORS
• HEALTH SAFETY AND ENVIRONMENT
• ANTICIPATED ENVIRONMENTAL IMPACTS
• MITIGATION MEASURES (PROPOSED)
• HSE REQUIREMENT
• SAFETY & OCCUPATIONAL MEASURE
• POTENTIAL RISKS
• PROPOSED IMPLEMENTATION SCHEDULE
• PROJECT FINANCIALS
• CONCLUSIONS
• PRELIMINARY PLANT LAYOUT
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)