COMPUTER SOFTWARE DEVELOPMENT AND CALL CENTRE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Software and software services have become the order of day.  Organising the development and distribution of these services  is largely  handled by computer  centres. The  different  services which will be provided by  the  computer centre considered here are

(i)   Software services
(ii)   Computer programming classes and
(iii)  Industrial computer packages.

Besides,  the job the date processing can also be taken  up, depending upon the reuirements of local clients.

Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

COMPUTER SOFTWARE DEVELOPMENT AND CALL CENTRE

Land and Building

Area 2000 Sq.Mtrs. Rs. 95.50 Lacs

Plant & Machinery

Rs. 80.35 Lacs

Working Capital 3 Months

Rs. 56.68 Lacs

Total Capital Investment

Rs. 2.98 Cr

Rate of Return

97%

Break Even Point

30%