COPPER SULPHATE FROM COPPER ASH/SCRAP

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

COPPER SULPHATE FROM COPPER ASH/SCRAP
[CODE NO. 1602]

Copper sulphate is a well known compound of copper. The commercial name of this compound is Blue Vitriol. Blue stone or chalcantihite. Copper sulphate is used in copper plating, as a mordant in dyeing, as a laboratory reagent, in electric batteries, in production of others salts, as germicide and insecticide in leather industry pulp in pigments in the preservation of wood, pulp and ground pulp in the process of engraving and lithography in ore flotation, destroying large and low roms of animal life from drinking water, in petroleum industry synthetic rubber, steel manufacture etc.

PROJECT REPORT COVERS:

  •         Introduction
  •         Uses and Applications
  •         Properties
  •         Market Survey with future aspects
  •         Present Manufacturers
  •         B.I.S. Specifications
  •         Manufacturing Process with Formulae
  •        Cost Economics with Profitability Analysis
  •         Capacity
  •         Land & Building Requirements with Rates
  •         List & Details of Plant and Machinery with their Costs
  •         Raw Materials
  •         Details/List and Costs
  •         Power & Water Requirements
  •         Labour/Staff Requirements
  •         Utilities and Overheads
  •         Total Capital Investment
  •         Turnover
  •         Cost of Production
  •         Break Even Point
  •         Profitability
  •         Land Man Ratio
  •         Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

5.00 MT/Day

Land and Building

Area 1500 Sq.Mtrs. Rs. 1.27 Cr

Plant & Machinery

Rs. 49.00 Lacs

Working Capital for 3 Months

Rs. 3.14 Cr

Total Capital Investment

Rs. 5.00 Cr

Rate of Return

45%

Break Even Point

34%