COSMETIC TALCUM POWDER

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

         Of All the cosmetics consumed, talcum powders talcum powder underebly leads the list.  In earliest human societies,  powdered materials  and clay muds were among the first preparations to  be used on the face for commetic purposes, and they are still  being used  in this manner by primitive people.  The  first  substances used  for powder were such simple and widely divefgent  produccts as  chalk and white lead. Slowly, they involved more  complicated blends  of different materials, finally to emerge in  the  modern concept and interpretation of powders.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

1.00 Ton/Day

Land & Building

Area 600 Sq.Mtr Rs. 40.50 Lacs

Plant and Machinery

Rs. 11.25 Lacs

Working Capital for 2 Months

Rs. 25.97 Lacs

Total Capital Investment

Rs. 82.97 Lacs

Rate of Return

23%

Break Even Point

43%