COTTON SPINNING MILL

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

               No  one  really  knows for certain  when  man  took  weaving cloths.   It  is know Adam and Eve knew of their  nakedness  when they had eaten the fruit of knowledge.  They then made approus of fig  leaves to cover their nudity.  Be that as it may, the  first evidence  we  have of cloth being used is  during  neolithic  age (6000  years  ago) when we find that the strands  of  animal  and vegetable  fibre were made into thread by twisting by  hand,  the thread  plaited  together and then woven into a  simple  pit-loom into  cloth.  Fragment of such plaited cloth have been  found  in Switzerland.  In India, perhaps, it happened likewise but we have nothing  on record.  According to the sacred texts of  the  Vedas the  basic  apparel  continued  to  comprise  of  Antaria  (lower garment)  and  Uttaria  (upper garment) both  unstitched  but  in addition  men  and woman began to a kayaband (sash)  to  hold  up Antaria.  A Urinisoe (turban) began to be worn as head gear.

  Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

50.00 Ton/Day

Land and Building

Area 4 Acres Rs. 95.00 (Rupees in Thousand)

Plant & Machinery

Rs. 4.00 (Rupees in Thousand )

Working Capital 3 Months

Rs. 2.16 Rupees in Thousand

Total Capital Investment

Rs. 7.57 Rupees in thousand

Rate of Return

35%

Break Even Point

42%