Description
INTRODUCTION
CHARACTERISTICS OF SYRINGES
TYPES OF SYRINGE TIPS
TYPES OF SYRINGES
TYPES OF HYPODERMIC NEEDLES
USES AND APPLICATION
B.I.S. SPECIFICATION
PROCESS FLOW CHART FOR DISPOSABLE SYRINGE
MANUFACTURING PROCESS OF DISPOSABLE SYRINGE
LIST OF RAW MATERIAL
INSPECTION AND TESTING
LIMIT FOR EXTRACTABLE MATTER
LIMIT FOR EXTRACTABLE MATERIAL
LUBRICANTS
NOZZLE
GRADUATION POSITION OF SCALE NUMBERING
FLANGE OF BARREL OR FINGER GRIPS
PISTON
DEAD SPACE VOLUM
MAXMUM DEAD SPACE
LEAKAGE TESTING
MARKING OF UNIT CONTAINER
OUTER CONTAINER
OVERVIEW OF DISPOSABLE PLASTIC SYRINGE IN NEPAL
HEALTH CARE SERVICE IN NEPAL IS MOVING IN THE RIGHT DIRECTION
ARRIERS TO EQUITABLE HEALTHCARE
DETAILED EXPORT DATA OF DISPOSABLE SYRINGE 5ML NEEDLE
MARKET POSITION
EXPORT DATA OF DISPOSABLE SYRINGE
EXPORT DATA OF DISPOSABLE SYRINGE 5ML NEEDLE
IMPORT DATA OF DISPOSABLE SYRINGE
IMPORT DATA OF DISPOSABLE SYRINGE 5ML NEEDLE
GCC SYRINGES AND NEEDLES MARKET
PLANT LAYOUT
MANUFACTURERS/SUPPLIERS OF DISPOSABLE SYRINGE
COMPLETE PLANT SUPPLIERS FOR DISPOSABLE SYRINGES
SUPPLIERS OF RAW MATERIALS
POLYPROPYLENE GRANULES
SUPPLIERS OF THERMOPLASTIC ELASTOMER
SUPPLIERS OF ETHYLENE OXIDE
SUPPLIERS OF PRINTING INK
SUPPLIERS OF PACKING PAPER
SUPPLIERS OF PACKING BOXES
SUPPLIERS OF PACKING MATERIALS
DISPOSABLE NEEDLE
SUPPLIERS OF DISPOSABLE SYRINGE GASKET
SUPPLIERS OF PLANT AND EQUIPMENTS FOR DISPOSABLE SYRINGE/TURNKEY CONSULTANTS 99
INJECTION MOLDING MACHINE
SCREEN PRINTING MACHINE
STETRLIZING MACHINE
AUTOMATIC BLISTER PACKING MACHINE
EOT CRANE
SUPPLIERS OF POWER TRANSFORMER
SUPPLIERS OF ELECTRICAL PANEL
SUPPLIERS OF COOLING TOWER
SUPPLIERS OF EFFLUENT TREATMENT PLANT (ETP PLANT)
AIR POLLUTION CONTROL EQUIPMENTS
AIR CONDITIONING EQUIPMENTS
AIR COMPRESSORS
PLATFORM WEIGHING MACHINE
MATERIAL HANDLING EQUIPMENTS
FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF SUBMERSIBLE WATER PUMP
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)