E.R.W. STEEL PIPES & TUBES

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Pipes    and   tubes   find   use   in   almost   all    the industries/services in one way or the other.  Automobile vehicles use  metallic pipes, including steel pipes, of a  large  variety.  Gas/water/liquids  transporting  pipes  are  spread   everywhere.  Irrigation,     petroleum    products,    sewerage,     chemicals transportation pipes and those used in mines, public water supply networks, are well known.

Hydraulic  piping  may  be divided into  (i)  rigid  &  (ii) flexible classes.

Rigid  piping of iron & steel is either seamless  or  welded type.   Pipes have specified end-threading pipe-fittings  in  the piping   net-work.   The  following  common  tube  sizes,   their bend=radii  &  other pertinent data, are taken care  of  by  pipe manufacturers.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

60.00 MT/Day

Land & Building

Area 10,000 Sq.Mtr Rupees in Lacs Rs. 481 Lacs

Plant and Machinery

Rs. 566 Lacs

Working Capital for 3 Months

Rs. 2.175 Lacs

Total Capital Investment

Rs. 3.574 Lacs

Rate of Return

84%

Break Even Point

20%