Description
INTRODUCTION
ADVANTAGES
DISADVANTAGES
TYPES OF ELECTRIC TWO-WHEELER
E-BIKES
WHY EV’S?
TYPES OF ELECTRIC SCOOTER
ADVANTAGES OF ELECTRIC TWO WHEELERS
LIMITATIONS OF ELECTRIC TWO WHEELERS
WORKING PRINCIPLE
BATTERY
BATTERY UPGRADATION
ALTERNATOR
WIRING HARNESS
CONTROLLERS
CHASSIS
POWER UNIT
BASE PLATE
CONE SET AND BEARINGS
SPECIFICATION
USES AND APPLICATION
B.I.S
PRODUCTION PROCESS
FABRICATION OF CHASSIS, STANDS, BASE PLAT AND MUD GUARDS
FABRICATION OF CHASIS
FABRICATION OF STAND
COMPONENT OF SYSTEM
HELICAL SPRING
CAST IRON ROD
LIFTING GEAR LEVER
FABRICATION PROCESS
FABRICATION PROCESS OF BASE PLATE
FABRICATION PROCESS OF MUDGUARD
STEP 1: MATERIALS
STEP 2: CUT YOUR BLANK
STEP 3: TOOLS YOU’LL NEED
STEP 4: START WITH THE HAMMER
STEP 5: SHRINK THE EDGES
STEP 6: TUCK THE EDGES (IF NEEDED)
STEP 7: PLANISH THE SURFACE
STEP 8: WHEEL THE SURFACE
STEP 9: FILE THE SURFACE
STEP 10: SAND THE SURFACE
ASSEMBLING PROCESS
(1) FRONT WHEEL INSTALLATION
(2) HANDLEBARS INSTALLATION
(3) MIRROR’S INSTALLATION
(4) PEDAL’S INSTALLATION
(5) REAR STORAGE TRUNK INSTALLATION
(6) THROTTLE & ACCESSORY CONTROL GRIP INSTALLATION
(7) SEAT INSTALLATION
(8) INSTALLATION OF REAR BRAKE
(9) TIRE INSTALLATION
WHEEL ADJUSTMENTS/MAINTANENCE
(10) DRIVE CHAIN INSTALLATION
CHECKING CHAIN TENSION
TIGHTEN DRIVE CHAIN
LOOSEN DRIVE CHAIN
(11) BATTERY INSTALLATION
(12) INSTALLATION OF ADOPTER
(13) TESTING OF ELECTRIC TWO WHEELER
RELIABILITY TEST
PRODUCT TESTING
E-BIKE TEST PROCEDURE
QUALITY CONTROL
RELIABILITY TEST
PRODUCT TESTING
PLANT LAYOUT
PROCESS FLOW CHART
MARKET POSITION
MARKET GROWTH
PRINCIPLES OF PLANT LAYOUT
STORAGE LAYOUT
EQUIPMENT LAYOUT
SAFETY
PLANT EXPANSION
FLOOR SPACE
UTILITIES SERVICING
BUILDING
MATERIAL-HANDLING EQUIPMENT
RAILROADS AND ROADS
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY
2. MARKETS
3. POWER AND FUEL SUPPLY
4. WATER SUPPLY
5. CLIMATE
SPECIFIC FACTORS
6. TRANSPORTATION
7. WASTE DISPOSAL
8. LABOR
9. REGULATORY LAWS
10. TAXES
11. SITE CHARACTERISTICS
12. COMMUNITY FACTORS
13. VULNERABILITY TO WARTIME ATTACK
14. FLOOD AND FIRE CONTROL
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
DEPRECIATION
FIXED ASSETS
WORKING CAPITAL
BREAK-EVEN POINT
OTHER FIXED EXPENSES
MARGIN MONEY
TERM LOANS
TOTAL LOAD
LAND AREA/MAN POWER RATIO
MANUFACTURERS/SUPPLIERS OF ELECTRIC TWO WHEELERS
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF BLDC MOTOR
SUPPLIERS OF MOTOR CONTROLLER
SUPPLIERS OF LITHIUM- ION BATTERY
SUPPLIERS OF TYRE
SUPPLIERS OF WHEEL
SUPPLIERS OF SPARES
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF JIGS AND FIXTURE
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)