EMPTY HARD GELATINE CAPSULES

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

   Gelatin  formulations  in  the  food  industry  use  almost exclusively water or aqueous polyhydric alcohols as solvents  for candy, marshmallow, or dessert preparations.

In  dairy  products and frozen foods,  gelatin’s  protective colloidal  action prevents crystallization of ice and sugar.   In general, a 250-bloom  gelatin is added at concentrations  ranging from 0.25% in frozen cream pies to 0.5% in ice cream; the use  of gelatin in ice cream has greatly diminished in recent years.   In sour cream and cottage cheese, gelatin inhibits water separation.

Project Reports Cover:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

400000000 Nos/Day

Land & Building

Area 1.50 Acres Rs. 2.43 Cr

Plant and Machinery

Rs. 4.71 Cr

Working Capital for 2 Months

Rs. 38.54 Lacs

Total Capital Investment

Rs. 8.03 Cr

Rate of Return

17%

Break Even Point

66%