FERRO MANGANESE ON ALUMINO THERMIC PROCESS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Metallurgical knowledge had its beginnings in the stone  age when  same ancient craftsman first recognized the  difference  in behaviour  amongst  certain  of the “rocks”  with  which  he  was working. The stones familiar to this primitive aetisan were  hard and  brittle, and were capable of being fashioned into tools  and weapons  only  by  fedious  shaping,  chip  by  chip.  His  first encoumter  with  metal then, undoubtedly native copper  or  gold, must have been an exciting experiences.

  Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

35.00 MT/Day

Land and Building

Area 4000 Sq.Mtrs. Rs. 1.51 Cr

Plant & Machinery

Rs. 48.25 Lacs

Working Capital for 2 Months

Rs. 5.94 Cr

Total Capital Investment

Rs. 8.17 Cr

Rate of Return

30%

Break Even Point

59%