FIRE EXTINGUISHERS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Portable Fire Extinguishers

Cut-off of oxygen supply or bringing down the temperature of the  burning mass below its ignition point, are the two  ways  of fire fighting.  Pouring water  on burning materials serves as (i) the evaporation of water to steam involves the absorption of  the latent heat of vaporization which it takes from the burning  mass and  thus  in turn  the burning material, by giving its  heat  to water  for steam formation, becomes collar i.e.  its  temperature lowers.  (ii)  Oxygen supply to burning  materials is  abstracted as  air  is  swept  away  from  its  neighborhood  due  to  steam
formation.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

40.00 Nos/Day

Land & Building

Area 1500 Sq.Mtr Rs. 98.50 Lacs

Plant and Machinery

Rs. 4.48 Lacs

Working Capital for 3 Months

Rs. 13.96 Lacs

Total Capital Investment

Rs. 1.22 Cr

Rate of Return

33%

Break Even Point

45%