G.I. PIPE FITTINGS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Pipe  for  plumbing  either water or waste  pipe  is  always referred  to  by its inside diameter, A 1″ pipe, then  has  a  1″ inside  diameter, its actual diameter will be greater,  depending on  the  thickness  of  the particular  material.  When  pipe  is referred to here it is always in terms of is inside diameter.

All  pipe  is  male, that in its is  designed  to  fit  into fittings which are always female. Understanding  this concept can lead  to  a quicker understanding of many  other  plumbing  part. hich also are described in made . Female designations.

PROJECT REPORT COVERS:

  •         Introduction
  •         Uses and Applications
  •         Properties
  •         Market Survey with future aspects
  •         Present Manufacturers
  •         B.I.S. Specifications
  •         Manufacturing Process with Formulae
  •        Cost Economics with Profitability Analysis
  •         Capacity
  •         Land & Building Requirements with Rates
  •         List & Details of Plant and Machinery with their Costs
  •         Raw Materials
  •         Details/List and Costs
  •         Power & Water Requirements
  •         Labour/Staff Requirements
  •         Utilities and Overheads
  •         Total Capital Investment
  •         Turnover
  •         Cost of Production
  •         Break Even Point
  •         Profitability
  •         Land Man Ratio
  •         Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

5.00 MT/Day

Land and Building

Area 2000 Sq.Mtrs. Rs. 1.04 Cr

Plant & Machinery

Rs. 34.25 Lacs

Working Capital 3 Months

Rs. 1.10 Cr

Total Capital Investment

Rs. 2.55 Cr

Rate of Return

43%

Break Even Point

41%