Galvanizing process plant for electrical poles

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Galvanizing  plant  for Electrical poles to  Hot  Dip Galvanizing  process,  involving  pickling,  fluxing,  specter  & galvanizing.

A  large number of units are engaged in galvanizing  but  at the same time there are limited number of units which are busy in hot dip galvanizing for electrical poles .  Zinc is the only base for these units.  The process of protecting coating a base material such as Iron, with a  thin layer of zinc is known as `Galvanizing’.  The process is so called because the two metals constitute a galvanic couple of which zinc is more electropositive.  In the case of a crack in or peeling  off of the coating of the galvanized  material  galvanic action  sets  in & zinc dissolves in preference to  iron  due  to higher  solution pressure of the former.  Coating of Lead  &  Tin which are cathodic to Iron & Steel are protective only as long as they  remain intact.  Once they are penetrated corrosion of  Iron or  Steel proceeds even more rapidly than in the absence  of  any coating,  zinc  is  used  as  coating  material  because  it  has
following advantages :

i)   Obtained in pure state & at moderate price

ii)  Resistant to abrassion.

Project Reports covers:

Introduction
Uses and Applications
Properties
Market Survey with future aspects
Present Manufacturers
B.I.S. Specifications
Manufacturing Process with Formulae
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials
Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

40.00 Mtr/Day

Land & Building

Area 2000 Sq.Mtrs. Rs. 1.74 Cr

Plant and Machinery

Rs.96.10 Lacs

Working Capital for 1 Month

Rs. 4.62 Cr

Total Capital Investment

Rs. 7.44 Cr

Rate of Return

54%

Break Even Point

36%