Description
INTRODUCTION
SPIRITUAL BENEFITS OF POOJA JYOTI
CHARACTERISTICS OF OIL AND GHEE LAMP
PREFERENCE OF GHEE LAMP DURING PUJA RITUAL
EFFECTS ON THE WORSHIPPER OF DIYA BATTI
EFFECT ON THE WORSHIPPER AS PER KUNDALINI YOG
EFFECT ON THE SUBTLE SHEATHS OF THE WORSHIPPER
SPIRITUAL EXPERIENCE IMPARTED BY OIL AND GHEE LAMP
IMPORTANCE OF COW GHEE IN DIYA BATTI
MARKET POSITION OF GHEE DIYA BATTI
HOW TO DO MARKETING FOR GHEE DIYA BATTI
PRESENT MANUFACTURERS OF GHEE DIYA BATTI
FORMULATION OF GHEE DIYA BATTIS 22
MANUFACTURING PROCESS OF GHEE DIYA BATTI
PROCESS FLOW DIAGRAM
POINTS TO BE CONSIDERED WHILE USING A LAMP
VARIETY OF LAMP 26
WHY SHOULD A STRAIGHT WICK BE USED AS COMPARED TO PUFFED
UP WICK?
FEATURES AND SIGNIFICANCE OF GHEE DIYA BATTI
DIFFERENT KINDS OF LAMPS (DIYAS) AND THIR SIGNIFICANCE
LIGHTING LAMPS MADE UP OF VEGETABLES
LAMPS OF LEAVES
WICK OF LAMPS
IMPLEMENTATION SCHEDULE
ILLUMINATION THE SCIENCE BEHIND THE DIWALI DIYA
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF RAW MATERIALS
COTTON
COW PURE GHEE
CAMPHOR POWDER
SUPPLIERS OF PLANT AND MACHINERY
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)