GOLD POTASSIUM CYANIDE (GPC) BY ALKALI METHOD

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Gold is normally electro deposited from a  solution  containing essentially  a  double cyanide  of Gold  and  an  alkali  metal, additional  alkali  cyanide  (free cyanide)  and  other  alkaline compounds. This solution is usually produced from gold potassium cyanide or sometimes from gold cyanide or gold potassium cyanide. For electro-plating process anodes used are usually that stainless steel (alkaline process), platinized titanium or carbon (acid process) or gold (acid and alkaline process).

INTRODUCTION
GOLD CYANIDE PRODUCTION PLANT
OROSTUDIO “ITALY”
USES AND APPLICATION
PROPERTIES
B.I.S. SPECIFICATION
MARKET SURVEY
PRESENT MANUFACTURER OF GOLD POTASSIUM CYANIDE
RAW MATERIALS
MANUFACTURING PROCESS OF GOLD POTASSIUM CYANIDE
PROCESS FLOW DIAGRAM
MANUFACTURING PROCESS OF GOLD POTASSIUM CYANIDE USING ALKALI METAL CYANIDE
PREPARATION METHOD FOR GPC (GOLD POTASSIUM CYANIDE) USING AQUA REGIA
PROCESS FLOW DIAGRAM
OTHERS PROCESS OF GOLD POTASSIUM CYANIDE
MANUFACTURE OF GOLD POTASSIUM CYANIDE FROM GOLD CYANIDE AND POTASSIUM CYANIDE
RAW MATERIALS CALCULATION
PROCESS FLOW SHEET
PRODUCTION AND APPLICATION OF POTASSIUM CYANIDE    APPLICATIONS
POTASSIUM GOLD CYANIDE
TOXICITY OF POTASSIUM CYANIDE
TESTING METHOD FOR GOLD CYANIDE AND GOLD POTASSIUM CYANIDE FOR ELECTROPLATING FOR COMMERCIAL /ENGINEERING APPLICATION
PLANT LAYOUT
SUPPLIERS OF PLANT & MACHINERIES
SUPPLIERS OF RAW MATERIALS
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
EXPLANATION OF TERMS USEDIN THE PROJECT REPORT

APPENDIX –A

01.    PLANT ECONOMICS
02.    LAND & BUILDING
03.    PLANT AND MACHINERY
04.    OTHER FIXED ASSESTS
05.    FIXED CAPITAL
06.    RAW MATERIAL
07.    SALARY AND WAGES
08.    UTILITIES AND OVERHEADS
09.    TOTAL WORKING CAPITAL
10.    TOTAL CAPITAL INVESTMENT
11.    COST OF PRODUCTION
12.    TURN OVER/ANNUM
13.    BREAK EVEN POINT
14.    RESOURCES FOR FINANCE
15.    INSTALMENT  PAYABLE IN 5 YEARS
16.    DEPRECIATION CHART FOR 5 YEARS
17.    PROFIT ANALYSIS FOR 5 YEARS
18.    PROJECTED BALANCE SHEET FOR (5 YEARS)

Category: Tag:

Additional information

Plant Capacity

250.00 gm./day

Land and Building

Area 400 Sq.Mtr Rs.54.00 Lacs

Plant & Machinery

Rs.20.00 Lacs

Working Capital for 1 Month

Rs.1.26 Cr

Total Capital Investment

Rs.2.02. Cr

Rate of Return

49%

Break Even Point

32%