GRAPHITE MINING AND BENIFICATION PLANT

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The mineral graphite is one of the allotropes of carbon. It was named by Abraham Gottlob Werner in 1789 from the Ancient Greek γράφω (graphō), “to draw/write”,for its use in pencils, where it is commonly called lead (not to be confused with the metallic element lead). Unlike diamond (another carbon allotrope), graphite is an electrical conductor, a semimetal. It is, consequently, useful in such applications as arc lamp electrodes. Graphite is the most stable form of carbon under standard conditions. Therefore, it is used in thermo chemistry as the standard state for defining the heat of formation of carbon compounds. Graphite may be considered the highest grade of coal, just above anthracite and alternatively called meta-anthracite, although it is not normally used as fuel because it is difficult to ignite.

Project Reports Cover:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

12.00 MT/Day

Land & Building

Area 5 Acres Rs. 95.90 Lacs

Plant and Machinery

Rs. 2.74 Cr

Working Capital for 3 Months

81.37 Lacs

Total Capital Investment

Rs. 4.76 Cr

Rate of Return

75%

Break Even Point

29%