Description
INTRODUCTION
PROJECT LOCATION:- VIZAG, AP
MAP
GEOGRAPHY
ECONOMY
TOURIST ATTRACTIONS
CONNECTIVITY
USES & APPLICATIONS
HANDLE POLYETHYLENE DRUMS
COSMETICS
CHEMICALS AND FERTILIZERS
PHARMACEUTICALS
FOOD & BEVERAGES
B.I.S SPECIFICATIONS
RAW MATERIAL – HIGH DENSITY POLYETHYLENE
MARKET POSITION
RECENT DEVELOPMENTS & TRENDS IN THE PLASTIC DRUMS MARKET
COMPETITIVE LANDSCAPE
THE MAJOR MANUFACTURES IN HDPE DRUMS:-
THE HDPE DRUMS MARKET IS SEGMENTED BY TYPES:
THE HDPE DRUMS MARKET IS SEGMENTED BY APPLICATIONS:
EXPORT DATA OF HDPE DRUMS
MANUFACTURERS/SUPPLIERS OF HDPE DRUMS
FEATURES OF HDPE DRUMS
PROPERTIES OF HDPE
BENEFITS OF HDPE DRUMS
MANUFACTURING PROCESS OF HDPE DRUM
MOULDING PROCESS
THERE ARE TWO WAYS OF OVERCOMING THIS PROBLEM.
THE MINIMUM PRACTICAL CYCLE TIME CAN BE ESTABLISHED IN TWO WAYS:-
DETAILS OF BLOW MOULDING & PROCESS
BLOW MOULDING MACHINE PROVIDES THE FOLLOWING FUNCTIONS:
BLOW MOULDING MACHINE
THE MACHINE PROVIDES THE FOLLOWING FUNCTIONS:
THE AUTOMATIC BLOW MOULDING MACHINE GIVES THE FOLLOWING SEQUENCE OF OPERATIONS.
ELECTRICAL CONTROL PANEL:
EXTRUDER DRIVE
PARISON HEAD ASSEMBLY
IT CONSISTS OF MAINLY
SIDE FED HEAD:
FOR HDPE
TWO PARISON HEAD FOR HDPE
TOP FED HEAD FOR RPVC
ACCUMULATOR HEAD
PARISON CONTROL
PARISON CONTROL IS FOR THE CONTROL OF:
PARISON CUTTERS
BLOWING AND EJECTOR STATION
SEALING UNIT:
DEFLASHING UNIT
MICROPROCESSOR CONTROLS KWIC MICRO
MAIN MENU OFFERS FOLLOWING PAGES:
UNDER DATA ENTRY MENU FOLLOWING PAGES ARE AVAILABLE:
MOULD OPEN/CLOSE PARAMETERS:
CARRIAGE PARAMETERS:
BLOW PIN PARAMETERS:
GENERAL PARAMETERS:
PARISON PROFILE PARAMETERS:
TEMPERATURE PROFILE:
TROUBLE SHOOTING GUIDE FOR BLOW MOULDING
EXTRUSION BLOW MOULDING
EXTRUSION BLOW MOLDING
CONTINUOUS EXTRUSION EQUIPMENT
INTERMITTENT EXTRUSION MACHINERY
SPIN TRIMMING
PROCESS FLOW DIGRAM FOR DRUMS & BARRELS
TECHNICAL CONFIGURATION OF MACHINE
BST120-B EXTRUSION BLOWING MACHINE CONFIGURATION
HYDRAULIC PRESSURE
B.ELECTRIC APPLIANCE
C. PNEUMATIC SYSTEM
3. TECHNICAL PARAMETER
SIZES AND SPECIFICATION OF HDPE DRUMS
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF RAW MATERIALS
MASTER BATCHES
PRINTING INK
SUPPLIERS OF PLANT AND MACHINERIES
SCRAP GRINDER MACHINE
FIRE FIGHTING EQUIPMENTS
DG SETS
PRINTING MACHINE
MACHINERY PHOTOGRAPHS
RAW MATERIAL PHOTOGRAPHS
PRODUCT PHOTOGRAPHS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)