HDPE PIPES

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Provision of drinking water supply, or in other words `piped’ water  supply  to  urban and  rural  population,  constitutes  an important  aspect of developmental programmes in many  countries. Among several materials for pipes and fittings, plastics,  though of   recent  origin,  have  offered  vast   potentialities   both economical  and  technical, for exploitation  by  the  engineers, architects  and builders of the plastic  materials,  polyethylene (low  and  high density) and unplasticized PVC (rigid  PVC)  have been  the  prime contender, though to a  fairly  smaller  extent, polypropylene and ABS have made their appearance in this field. A
whole range of sanitary fittings and fixtures viz, taps, showers, gratings,  basin  and sink wastes, waste traps, float  balls  and valves,   syphons  for  flushing  cystems,  are  also   currently available in the market, moulded in different suitable plastics.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

2.40 MT/Day

Land & Building

Area 4050 Sq.mtr Rs. 2.96 Cr

Plant and Machinery

Rs. 76.70 Lacs

Working Capital for 3 Months

Rs. 2.00 Cr

Total Capital Investment

Rs. 5.93 Cr