INJECTION MOULDING
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
Electric lights are supplied with electricity from a storage battery. When the storage battery runs down, it can be recharged from an outside source, or from a dynamo, run from the engine. The old style ‘carbon’ filament in the electric globe consumed so much current that it was difficult to obtain a storage battery of a reasonable size and weight which would supply current from any length of time. The carbon filament lamp used a filament chemically treated and in a vacuum. Thefilament in the “Tungsten mazda” globe reduces the current consumption and is not liable to break with the unusual motor car vibration. There are three methods of furnishing electric current for car lighting.
1. By independent storage battery system.
2. By generator & battery system.
3. By an independent generator system.
1. INTRODUCTION
2. USES AND APPLICATIONS
3. MARKET SURVEY
4. PRESENT MANUFACTURERS
5. BIS SPECIFICATIONS
6. MANUFACTURING PROCESS
7. PROCESS FLOW SHEET
8. NAMES AND ADDRESSES OF MACHINERY
AND EQUIPMENT SUPPLIERS
9. NAME AND ADDRESSES OF
RAW MATERIAL COMPONENTS
APPENDIX – A :
1. COST OF PLANT ECONOMICS
2. LAND & BUILDING
3. PLANT AND MACHINERY
4. FIXED CAPITAL INVESTMENT
5. RAW MATERIAL
6. SALARY AND WAGES
7. UTILITIES AND OVERHEADS
8. TOTAL WORKING CAPITAL
9. COST OF PRODUCTION
10. PROFITABILITY ANALYSIS
11. BREAK EVEN POINT
12. RESOURCES OF FINANCE
13. INTEREST CHART
14. DEPRECIATION CHART
15. CASH FLOW STATEMENT
16. PROJECTED BALANCE SHEET