Description
INTRODUCTION
INNER GROOVED COPPER TUBE SPECIFICATION
INTERNALLY GROOVED COPPER TUBE TOLERANCES
BENEFITS TO USE INNER GROOVE COPPER TUBE:
USES AND APPLICATION
B.I.S. SPECIFICATION
PROCESS FLOW DIAGRAM
MANUFACTURING PROCESS
METHOD OF INNER GROOVE
REVOLUTION MECHANISM
FLOATING FRAME
UNWINDING BOBBIN
FIRST GUIDE CAPSTAN
FIRST DRAWING DIE
FIRST REVOLVING CAPSTAN
TURNING FLYER
SECOND REVOLVING CAPSTAN
SECOND DRAWING DIE
SECOND GUIDE CAPSTAN
WINDING BOBBIN
QUALITY CONTROL
QUALITY ASSURANCE PLAN
DESTRUCTIVE TESTS
1. TENSILE TEST
2. DRIFT EXPANDING TEST
NON-DESTRUCTIVE TESTING
1. EDDY-CURRENT TEST
2. HYDROSTATIC TEST
3. PNEUMATIC TEST
4. HYDROGEN EMBRITTLEMENT TEST (FOR CU-DHP AND CU-DPA GRADES)
PACKING
MARKING
MARKET POSITION
MARKET OVERVIEW
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TOTAL LOAD:
8. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
SUPPLIERS OF INNER GROOVED COPPER TUBE
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF COPPER BILLET
SUPPLIERS OF PLANT AND MACHINERY
SUPPLIERS OF BILLET CUTTING MACHINE
SUPPLIERS OF BILLET STRAIGHTNING MACHINE
SUPPLIERS OF REHEATING FURNACE
SUPPLIERS OF COMPLELE TUBE PLANT
SUPPLIERS OF METAL TESTING MACHINE
SUPPLIERS OF PRECISION MEASURING TOOLS
SUPPLIERS OF NDT INSPECTION EQUIPMENT
SUPPLIERS OF ELECTRICAL MEASURING INSTRUMENTS
SUPPLIERS OF DG SETS
SUPPLIERS OF EOT CRANES
SUPPLIERS OF POWER TRANSFORMER
SUPPLIERS OF ELECTRICAL PANEL
SUPPLIERS OF ELECTRIC MOTOR
SUPPLIERS OF COOLING TOWER
SUPPLIERS OF EFFLUENT TREATMENT PLANT (ETP PLANT)
SUPPLIERS OF AIR POLLUTION CONTROL EQUIPMENTS
SUPPLIERS OF AIR CONDITIONING EQUIPMENTS
SUPPLIERS OF AIR COMPRESSORS
SUPPLIERS OF PLATFORM WEIGHING MACHINE
SUPPLIERS OF MATERIAL HANDLING EQUIPMENTS
SUPPLIERS OF FIRE FIGHTING EQUIPMENTS
SUPPLIERS OF SHOT BLASTING MACHINE
SUPPLIERS OF JIGS AND FIXTURE
SUPPLIERS OF SUBMERSIBLE WATER PUMP
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)