INSTANT NOODLES

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

The  urgency for the development of  nutritionally  balanced protein  foods which would be within the reach of  a  substantial portion  of the population in a country like India can hardly  be over-emphasized.

The  dietery  deficiencies of  protein,  particularly  among pre-school children and also during the prenatal period, can lead to  both physical and mental impairment.  Unless this is made  up early in life there is every danger of it becoming imeparable.

  Project Report Covers:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

1.00 MT/Day

Land and Building

Area 1200 Sq.mtrs. Rs. 91.75 Lacs

Plant & Machinery

Rs. 37.00 Lacs

Working Capital for 2 Months

Rs. 32.22 Lacs

Total Capital Investment

Rs. 1.72 Cr

Rate of Return

26%

Break Even Point

59%