L.P.G. BOTTLING PLANT

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Through out the commercial life time of a hydrocarbon  fuel, from  production  at  the  weelhead  to  combustion  in  chamber, considerations  of  fuel  storage  movement,  loss,  safety   and contamination   apply.  These  are  determined  largely  by   the properties  of  the fuel itself and are therefore  controlled  by suitable  property  specifications.  They  are  also   influenced significantly  by  the  design of  the  handling  equipment,  the procedures  adopted and in some cases by the use  of  appropriate fuel additives.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

10000 Cylinder/Day

Land & Building

Area 10000 Sq.Mtr Rs. 11.49 Cr

Plant and Machinery

Rs. 2.30 Cr

Working Capital for 2 Months

Rs. 8.67 Cr

Total Capital Investment

Rs. 27.50 Cr

Rate of Return

56%

Break Even Point

25%