Leather Shoes

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

        Since  the time, mankind discovered leather as a  protective material for the foot, chappals in different forms were made.  In the  beginning  chappals  had only  fuctional  utility,  i.e.  to  protect  foot   form thorns, insects etc. Today  in  addition  to fuctional  utility chappals have also become an item  of  fashion and  also form a part of dress which has necessiated  changes  in the  manufacturing  process. Today chappels are  used  by  simple  villageers, farmers, common people of urban areas ans also by the rich  people. To cope up with the requirement of different  types of  materials and by different manufacturing process is  cemented construction. These cemented sole chappals with decorative, plain or  odourful  straps,  have become very  popular.  This  type  of chappals have also found a good overseas market.

Project Reports Cover:    Introduction

  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

5000.00 Pairs/Day

Land & Building

Area 5000 Sq.Mtr Rs.3.50 Cr

Plant and Machinery

Rs. 1.18 Cr

Working Capital for 2 Months

Rs. 12.25 Cr

Total Capital Investment

Rs. 17.17 Cr

Rate of Return

79%

Break Even Point

22%