Additional information
Plant Capacity | 50.00 MT |
---|---|
Land & building | 1500 Sq.Mtrs US$ 3.82 Lacs |
Plant & machinery | US$ 1.18 Lacs |
W.c for 3 months | US$ 20.55 Lacs |
Total capital investment | US$ 25.92 Lacs |
Rate of return | 26% |
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.MS Billets have got tremendous demand in India and overseas countries. This unit is having a huge profit of margin. The plant and equipment and raw materials are available in India. The Induction furnace based on steel plant is a versatile installations where provisions are available for producing a range of steel products by Alloying and casting into various shape. The products of steel plants are in the form of Ingots, Billets, Sheets etc. The induction furnace are being manufactured in India by many many manufacturers. These Induction furnace based steel casting units are suitable for small scale industries and medium scale sectors and yet have the capability to complete in the internal as well as international market at all counts. In steel plant operating under Indian conditions small Billets are Cast for rolling into structural sections, Mild steel billets (MS Billets) are manufacturing by various types of furnaces such as Blast Furnace, Electric Arc furnace (EAF), Induction Furnace, Basic oxygen furnace etc. EIRI have prepared a Detailed Techno-Economic Feasibility Report for the entrepreneurs who wish to establish their own manufacturing unit anywhere in India or in abroad.
Each ‘EIRI’ MARKET OVERVIEW CUM DETAILED TECHNO ECONOMIC FEASIBILITY REPORT (Complete Report) tentatively covers
• Introduction
• Properties
• BIS (Bureau of Indian Standard) Specifications & Requirements
• Uses & Applications
• Present Indian Market Overview/Position
• Export & Import Statistics Data
• Names and Addresses of Existing Units (Present Manufactures)
• List of Plant & Machineries
• Miscellaneous Items and Accessories
• Instruments, Laboratory Equipments and Accessories
• Electrification, Electric Load and Water
• Maintenance, Suppliers/Manufacturers of Plant and Machineries
• Manufacturing Process with Formulations (If applicable)
• Flow Sheet Diagram
• List of Raw Materials
• Availability of Raw Materials
• Requirement of Staff & Labour
• Personnel Management
• Skilled & Unskilled Labour
• Requirement of Land Area
• Built up Area
• Plant Layout
Along with financial details as under:
• Summary of Capital Cost of Project
• Land & Side Development Exp.
• Buildings
• Plant & Machineries
• Misc. Fixed Assets
• Technical Know how Fees & Exp.
• Preliminary Expenses
• Pre-operative Expenses
• Provision for Contingencies
Below mentioned financial statements (Annexure) will be for 5 to 10 Years
• Annexure:: Cost of Project and Means of Finance
• Annexure:: Output, Profitability and Cash Flow Chart
• Annexure:: Assessment of Working Capital requirements
• Annexure:: Sources of Finance
• Annexure:: Balance Sheets
• Annexure:: Break-Even Analysis and profitability analysis.
• Annexure:: Quantitative Details-Output/Sales/Stocks
• Annexure:: Sales Realisation
• Annexure:: Raw Material Cost
• Annexure:: Other Raw Material Cost
• Annexure:: Packing Material Cost
• Annexure:: Consumables, Store etc.,
• Annexure:: Employees Expenses
• Annexure:: Fuel Expenses
• Annexure:: Power/Electricity Expenses
• Annexure:: Repairs & Maintenance Exp.
• Annexure:: Other Mfg. Expenses
• Annexure:: Administration Expenses
• Annexure:: Selling Expenses
• Annexure:: Depreciation Charges – Profitability
• Annexure:: Depreciation Charges
• Annexure:: Interest and Repayment – Term Loans
• Annexure:: Tax on Profit
• Annexure:: Assumptions for Profitability workings
• Annexure:: Assessment of Working Capital
Plant Capacity | 50.00 MT |
---|---|
Land & building | 1500 Sq.Mtrs US$ 3.82 Lacs |
Plant & machinery | US$ 1.18 Lacs |
W.c for 3 months | US$ 20.55 Lacs |
Total capital investment | US$ 25.92 Lacs |
Rate of return | 26% |