M.S. SAW (SUBMERGED ARC WELDED) SPIRALLY WELDED PIPE

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

     The  importance of steel tubes and pipes in the  present-day world can be suitably illustrated by drawing the parallel example of  the importance of veins, arteries and intestines  which  form indispensable  tubular  networks  in  the  human  body  for   the conveyance  of solids, liquids and gases essential for  survival.
Piped  water supplies are essential is cities, and bear  evidence of  higher standard of living in small towns and villages.  Steel tubes  are  also necessary for tube wells which provide  a  cheap method of procuring water for drinking and agriculture.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

30.00 MT

Land & Building

Area 5000 Sq.mtr Rs. 3.10 Cr

Plant and Machinery

Rs. 4.67 Cr

Working Capital for 3 Months

Rs. 11.50 Cr

Total Capital Investment

Rs. 20.13 Cr

Rate of Return

21%

Break Even Point

55%