Description
INTRODUCTION
PROPERTIES OF RAW SILK FIBRE
SILK DEGUMMED
USES OR APPLICATION
GRADING OF RAW SILK
DISEASES OF SILK WORMS & PREVENTIVE MEASURE
SERICULTURE
B.I.S. SPECIFICATION
MARKET OVERVIEW OF SILK IN INDIA
EXPORT EARNINGS FROM SILK DURING 2016-17 TO 2018-19
COUNTRY WISE EXPORT EARNINGS FROM SILK GOODS DURING
2016-17 TO 2018-19
RAW MATERIALS
MANUFACTURING PROCESS OF SILK YARN FROM RAW SILK CACOON
SORTING COCOON
SOFTENING THE SERICIN
REELING
THROWING
PROCESS FLOW DIAGRAM
STEP IN SILK YARN MAKING
1. HARVESTING
2. STIFLING & SORTING
3. BOILING
4. DEFLOSSING
5. REELING
6. TWISTING & DYING
DETAILED PROCESS TO MANUFACTURE SILK YARN
CULTIVATION OF COCOONS:
BOILING OF COCOONS
FILATURE OPERATIONS:
1. SORTING COCOONS:
2. SOFTENING THE SERICIN:
3. REELING THE FILAMENT:
THROWING:
DEGUMMING OF THROWN SILK:
SERICULTURE
BREEDING SILKWORMS
FEEDING THE LARVA
SPINNING THE COCOON
STOVING THE CHRYSALIS
THE FILATURE
SORTING AND SOFTENING THE COCOONS
REELING THE FILAMENT
PACKAGING THE SKEINS
FORMING SILK YARN
DEGUMMING THROWN YARN
FINISHING SILK FABRICS
REELING OF NON MULBERRY COCOON
A) TASAR COCOON REELING
TABLE: REELING EFFICIENCY OF DOUPION SILK BY THE SIZES OF THREAD
TABLE: A TRIAL OF TASAR COCOON REELING
B) ERI COCOON SPINNING
TABLE: A SURVEY OF CHARACTERISTICS OF ERI COCOON BAVE
MANUFACTURE OF FLOSS SILK
DEGUMMING
OPENING-UP
FINISHING
TABLE: YIELD OF FLOSS SILK AND SPUN SILK BY DIFFERENT
COCOON RAW MATERIALS
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
PRIMARY FACTORS8
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
PROJECT IMPLEMENTATION SCHEDULES
INTRODUCTION
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
TIME SCHEDULE
PLANT LAYOUT
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF PLANT AND MACHINERY
BUYERS OF SILK YARN
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)