MARBLE PROCESSING PLANT (MARBLE CUTTING AND POLISHING UNIT)
The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.
We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.
Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.
The term marble is derived from the latin work “MARMOR” which itself comes from the Greek root “MARMAROS” meaning these by a shining stone. In ancient times, any stone capable of taking polish, without any regard to its chemical composition was designated as marble. Even the serpentines, alabaster, and granites was categorized as marble – if they could take polish. However, in course of time, earth sciences developed a more sophisticated and accurate classification which can categories rocks on the basis of their birth-history.
• INTRODUCTION
• USES AND APPLICATION
• SPECIFICATIONS
• MARKET POSITION OF MARBLE IN ETHIOPIA
• PROJECTED DEMAND OF MARBLE PRODUCTS
• MARKET SURVEY (GLOBAL)
• INDIAN STANDARD SPECIFICATIONS OF BUILDING STONES
• MANUFACTURING PROCESS
• PROCESS IN DETAILS
• PROCESS FLOW DIAGRAM
• TYPES OF WASTE GENERATED IN MARBLE QUARRING AND
PROCESSING AND DISPOSAL PRACTICES
• ENVIRONMENTAL IMPACT IN MARBLE PROCESSING
• FOREIGN COLLABORATION
• SUPPLIERS OF PLANT & MACHINERIES
• SUPPLIER OF PLANT & MACHINERY CIRCULAR SAW
• SUPPLIERS OF PLANT AND MACHINERIES (IMPORTED
• RAW MATERIAL SUPPLIERS
APPENDIX –A
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)