MEDIUM DENSITY FIBERBOARD (MDF) (60 MT/DAY )

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Development of Medium density fiberboard (MDF) and fibre board has been consequential
to man’s quest for optimum utilization of timber and wood wastes which earlier were
used mainly as fuel.

Initial development of Medium density fiberboard (MDF) board took place in Germany
during the Second World War when its timber supplies were practically cut-off from the
supplying countries. Medium density fiberboard (MDF) board plants were set up in
postwar West Germany to meet the demand for reconstruction. In the fifties Medium
density fiberboard (MDF) board manufacturing plants were set up in Europe and USA. The
industry has now developed throughout the world.

Category: Tag:

Description

INTRODUCTION
APPLICATION/USES
ADVANTAGES
APPROACH TO MANUFACTURING
ADHESIVES IN MEDIUM DENSITY FIBERBOARD (MDF)
RAW MATERIAL
RAW MATERIAL SUPPLIERS
SPECIFICATIONS
MARKET OVERVIEW
SWOT ANALYSIS
FORMULATION
MANUFACTURING PROCESS STEPS
TECHNOLOGY/R & D EFFORTS
ENVIRONMENTAL ISSUES
KEY ACTIONS TO MANAGE ENVIRONMENTAL RISKS
OCCUPATIONAL HEALTH AND SAFETY
PROTECTIVE MEASURES
SUPPLIERS OF PLANT & MACHINERY
PRELIMINARY LAYOUT
ETP FACILITY
SEWAGE AND WASTE WATER EFFLUENT
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
ANTICIPATED ENVIRONMENTAL IMPACTS
MITIGATION MEASURES (PROPOSED)
PROPOSED IMPLEMENTATION SCHEDULE
PROJECT FINANCIALS
CONCLUSIONS

APPENDIX – A:

01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)

Additional information

Plant Capacity

60 MT/Day

Land & Building

(16,725 sq.mt.)

Plant & Machinery

US$ 2070000

Rate of Return

28%

Break Even Point

57%