MENTHOL CRYSTALS AND MENTHOL OIL

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Domestic Menthol Production

In India first distillation plant was installed at  Bilaspur by  a US based MNC in the year of 1973. Thereafter various  local distilleries  also came up at Sambhal, Chandausi  and  Moradabad. The survey conducted by Richardson Hindustan Ltd. determined that Tarai  Area  of Uttar-Pradesh would be a suitable place  for  the cultivation   of  Mentha  Arvensis.  The  crop  of   menthe   was successfully grown and when the mentha oil was extracted by Steam distillation,  mentha crop became a viable. Hindustan  Richardson Ltd.  established  a distillation unit in  BILASPUR  of  district Nainital, so confidently the Farmer could grow Mentha Herb.  They had  supplied the planting materials as well as  given  technical knowledge  to  grow the Mentha herb. As the result  the  area  of mentha crops substantially increased in entire tarai and  western districts  of  U.P. mainly Nainital, Rampur,  Moradabad,  Badaun, Bareilly   and  recently  extended  to  eastern  districts   viz. Barabanki, Lucknow & Sitapur districts.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.

Additional information

Plant Capacity

1.00 Ton/Day

Land & Building

Area 1000 Sq.Mtr Rs. 58.60 Lacs

Plant and Machinery

Rs. 40.00 Lacs

Working Capital for 2 Months

Rs. 2.17 Cr

Total Capital Investment

Rs. 3.25 Cr

Rate of Return

48%

Break Even Point

38%