METALLIC STEARATE BY PRECIPITATION AND FUSION PROCESS

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Stearates  of  aluminium, calcium, magnesium, and  zinc  are known as driers and metallic soaps.  It has long been established that  the  metal  or catier of the metallic soap  is  the  active principle  which  accelerates the  oxidation  and  polymerization reactions associated with the drying of oils.  As many as  twenty four metals are known to have activity, but the soaps of  cobalt, manganese,  lead, iron, calcium, zinc and zirconium  account  for
the major share of present-day-use.  Of these cobalt,  manganese, lead  and iron soaps are the primary driers.  Calcium, zinc,  and zirconium  soaps  alone do not promote drying.  They  are  useful only  in conjunction with one or more of the primary driers,  and thus  are  termed  auxilliary  driers.

PROJECT REPORT COVERS:

  •     Introduction
  •     Uses and Applications
  •     Properties
  •     Market Survey with future aspects
  •     Present Manufacturers
  •     B.I.S. Specifications
  •     Manufacturing Process with Formulae
  •    Cost Economics with Profitability Analysis
  •     Capacity
  •     Land & Building Requirements with Rates
  •     List & Details of Plant and Machinery with their Costs
  •     Raw Materials
  •     Details/List and Costs
  •     Power & Water Requirements
  •     Labour/Staff Requirements
  •     Utilities and Overheads
  •     Total Capital Investment
  •     Turnover
  •     Cost of Production
  •     Break Even Point
  •     Profitability
  •     Land Man Ratio
  •     Suppliers of Plant & Machineries and Raw Materials.
Category: Tag:

Additional information

Plant Capacity

10.00 MT/Day

Land & Building

Area 3000 Sq.Mtr Rs. 1.38 Cr

Plant and Machinery

Rs. 69.90 Lacs

Working Capital for 3 Months

Rs. 4.50 Cr

Total Capital Investment

Rs. 6.69 Cr

Rate of Return

50%

Break Even Point

32%