MINERAL TURPENTINE OIL (MTO) 10 KL FROM PETROLEUM (SUPERIOR KEROSENE OIL OR OTHER MATERIAL)

The project report includes Present Market Position and Expected Future Demand, Market Size, Statistics, Trends, SWOT Analysis and Forecasts. Report provides a comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

We can prepare PROJECT REPORT as per your INVESTMENT PLAN for BANK LOAN REQUIREMENT and INDUSTRY ANALYSIS. All reports are prepared by highly qualified consultants and verified by a panel of experts.

Have Query? Click Here to Chat
Industry Expert is Online, Chat with him for more detail.

Mineral turpentine, also known as turpentine substitute, turps substitute, or just turps is an inexpensive petroleum-based replacement for the vegetable-based turpentine. It is commonly used as a paint thinner for thinning oil-based paint and cleaning brushes, and as an organic solvent in other applications.

Mineral Turpentine Oil is versatile items derived from petroleum product and is used as a solvent in paints coating and in screen printing and as solvent or diluent,
The demand of paints coating etc. is increasing rapidly due to industrial development. Among the ingredient used for its manufacture is superior kerosene oil (S.K.O.) which is not drying type. However M.T.O. which is produces using S.K.O. as raw material is of easily drying type therefore used in screen printing under sunlight.
However the demand of Mineral Turpentine Oil is increasing day by day and hence there is a good scope for new entrant.

INTRODUCTION
USES AND APPLICATION
APPLICATION AND END USES OF SKO
ADDRESSES OF CONSULTANTS OF THINNER
B.I.S. SPECIFICATION
GRADES OF MINERAL TURPENTINE OIL
SPECIFICATION OF SUPERIOR KEROSENE OIL
PROPERTIES & CHARACTERSTICES TURPENTINE OIL
PROPERTIES & CHARACTERSTICES OF RAW MATERIALS USED
MARKET SURVEY
PRODUCTION OF PAINT & VARNISH
MANUFACTURERS/SUPPLIERS OF M.T.O
FORMULATIONS
MANUFACTURING PROCESS
PROCESS FLOW DIAGRAM
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
PROJECT IMPLEMENTATION SCHEDULES
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF PLANT & MACHINERY

APPENDIX – A :

1.      COST OF PLANT ECONOMICS
2.      LAND & BUILDING
3.      PLANT AND MACHINERY
4.      FIXED CAPITAL INVESTMENT
5.      RAW MATERIAL
6.      SALARY AND WAGES
7.      UTILITIES AND OVERHEADS
8.      TOTAL WORKING CAPITAL
9.      COST OF PRODUCTION
10.      PROFITABILITY ANALYSIS
11.      BREAK EVEN POINT
12.      RESOURCES OF FINANCE
13.      INTEREST CHART
14.      DEPRECIATION CHART
15.      CASH FLOW STATEMENT

Category: Tag:

Additional information

Plant Capacity

10.00 KL/day

Land & Building

(22000 Sq.Mtr) Rs. 1.43 Cr

Plant and Machineries

Rs. 40.50 Lacs

Working Capital for3 Months

Rs. 4.34 Cr

Total Capital Investment

Rs. 6.26 Cr

Rate of Return

65%

Break Even Point

26%